July 14, 2026, Tuesday
English

Muglin-Narayangadh road blocked due to continuous rains and landslides, administration request not to travel

Main News Image

Chitwan. The Muglin-Narayangadh road section has been completely blocked due to landslides caused by continuous rain. District Administration Office Chitwan has issued a notice not to drive vehicles on that road section for the time being saying that the current condition of the road is extremely dangerous. According to Road Division Bharatpur, stones are continuously falling from above in the Tuin River under the road section, while in Seti Dobhan area, the road has been blocked in both directions due to the landslides.

Heavy rains in the area since 7:30 pm on Monday have added challenges to the efforts to open the road. Ishwar Chhetri, supervisor of road division Bharatpur, informed that there is difficulty in removing the landslides due to non-stop rains.

mediabaaji add

Related News

Temperatures will reach 40 degrees with 'hot days' in the Terai

Kathmandu. According to Wednesday's weather forecast issued by the Department of Water and Meteorology, the weather will be very different across the country. Today afternoon most parts of the Terai will feel extremely hot and humid, while most of...

There will be fog and mist effect in Terai

Kathmandu. There is a partial effect of western wind over the country. According to the weather forecast division, there is partial rain across the country. In the Terai region of the country, it seems that the daily life, health, road and air tra...

Electricity will be cut in various places of Kathmandu today

Kathmandu. Nepal Electricity Authority is going to cut electricity in various places of Kathmandu today. The Authority has published a notification and said that there will be power cut in Sinamangal Chowk and Tilganga area under the jurisdiction...

National Earthquake Protection Day is being celebrated today

Kathmandu. Today is the 27th National Earthquake Safety Day. This day has been celebrated since 2055 in memory of the Great Earthquake of January 2, 1990. The purpose of celebrating this day is to spread awareness about earthquakes and increase pr...

Power outage in Dhankuta market for 36 hours

Kathmandu. The power supply of Dhankuta, which was disrupted due to the strong wind that hit on Monday night, has partially resumed operation. Although lines have been connected in some areas, the capital region is still without electricity. Accor...

Butwal-Narayangadh road still blocked

Nawalparasi The Butwal-Narayangadh road section, which has been blocked since Friday, has not been fully operational. Transport services were affected after the road became slippery and muddy in the lower section located in Binayi Triveni Rural Mu...