Muglin -Malekhu road upgradation work started
Kathmandu. The work of upgrading the Muglin-Malekhu road, which was only a normal work due to the rainy season, has started gaining intensity. After June, the road upgrading work slowed down. After the rain stopped and the festival was over, the work started to be intensified. According to Vijay Darai, engineer of the western section of the Muglin-Malekhu road under the Nagdhunga-Muglin road project, the work has been accelerated. The work on the access road to the bridge has been started. The access roads of four bridges are going to be constructed. Barrier work has been started on the bridge and other parts and drain work has also been started.
According to him, preparations have been made to start the black paper work in two to three days. Out of 38.86 kilometers of that section, eight kilometers of roads have been paved. Final preparations have been made for additional five kilometers of road blacking. According to Darai, the place where the final preparations have been made is about to be blacked out. Along with this, preparation work will be done for the black paper in other places. Among the other two bridges on that road section, one foundation of Charoodi Khol bridge has been laid. On the other hand, both the foundations of the Hoogdi river bridge have been prepared.
According to Darai, 35 percent of road upgrading has been completed so far. In this section, 2.2 km will be six-lane, which will be in Malekhu, Benighat and Muglin sections. The 7.2 km road will have four lanes. Stating that the four lanes will be in the areas of Danda, Kurintar, Fisling, Chumling, Mazhimtar, Charaudi and Vishaltar, Darai said that a three-lane 'climbing' route will be made in the uphill and downhill sections. According to him, the 'climbing' route will be 2.3 km and the rest of the road will be two lanes.
This road was contracted to be completed in three years on 15 January 2079. Under the Prithvi highway, Muglin-Nagdhunga section has been divided into three phases and bids have been invited. This falls under the third phase. It will expire on the 15th of January. Darai said that the process for extending the deadline has gone ahead. He said that the construction company will get an extension of a few months due to design modification etc.
Express
Related News
The price of gold increased, how much is the transaction going on today?
Kathmandu. The price of gold increased on Tuesday. Today, the price of gold has increased by Rs 900 per tola. According to the Nepal Gold and Silver Traders Federation, today the price of printed gold has been fixed at 3 lakh 5 thousand 500 rupees...
What is the exchange rate of US Dollar, Euro and Pound?
The Kathmandu. Nepal Rastra Bank has fixed the exchange rate of foreign currency for today. According to the price determined by the Central Bank, the buying rate of US Dollar today is 152 rupees 31 paise and the selling rate is 152 rupees 91 pais...
Singti Hydro will issue 100 percent rights
Kathmandu. Singti Hydro Energy Limited is going to issue rights. The company has appointed Muktinath Capital Limited as the sales manager for the rights issue. Sudip Khadka, Managing Director on behalf of Singti Hydro Energy Limited and Kavindra D...
With the beginning of Tihar, the buying and selling of flowers increased, Nepal is becoming self-sufficient in flower business
Kathmandu. With the beginning of Tihar, the second biggest festival of Nepalese, the buying and selling of flowers has increased rapidly. In Tihar, which is a festival of flowers and colors, there is a lot of use of flowers from worship to various...
The price of gold is rising day by day, how much is the transaction per tola today?
Kathmandu. The price of gold in the Nepalese market has exceeded three lakh 28 thousand rupees per tola. According to the Federation of Nepal Gold and Silver Traders, the price of gold in Chapawal was fixed at 328,600 rupees per tola on Tuesday. S...
Suryakund Hydro's IPO allotment, 57 thousand 243 people got shares
Kathmandu. Suryakund Hydro Electric Limited has issued an IPO to the general public. Sales manager Kumari Capital Limited has allotted the IPO this morning. This company had opened the IPO sale of 5 lakh 72 thousand 431 shares with a face value of...



