Kalinchok Hydropower gets permission from Securities Board to issue IPO
Kathmandu. Kalinchok Hydropower has received permission from the Nepal Securities Board to issue an IPO. The Securities Board on Monday allowed this company to issue an IPO worth Rs 130.75 million. Now this company will open the IPO sale of a total of 13 lakh 75 thousand shares with a nominal price of 100 rupees.
The company's IPO sales manager is RBB Merchant Banking.
Express
Related News
This is the exchange rate of foreign currency on Saturday
Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for 9 Saturday 0 today. According to which, the buying rate of one American dollar has been fixed at 151 rupees 88 paisa and the selling rate is 152 rupees 48 paisa....
What is the exchange rate of foreign currency on Wednesday?
Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to Rashtra Bank, the buying rate of one US dollar has been fixed at 141 rupees 48 paisa and the selling rate is 142...
Real estate transactions in Bagmati state are falling, revenue collection is down by 23.6 percent
Kathmandu. A study report has shown that revenue has been affected due to continuous decline in real estate transactions in Bagmati province. According to the economic activity study report published by Nepal Rastra Bank, it has been seen th...
Formation of study committee for re-operation of Biratnagar jute mill, report within one month
Kathmandu. The government has constituted a task force to study for re-operation of Biratnagar Jut Mill. It has been decided to form a working group with experts to study the existing economic, technical and legal conditions of the industry and re...
The price of gold increased again, how much is the transaction?
Kathmandu. Even today, the price of gold and silver has set a record in the local market. According to the Federation of Nepal Gold and Silver Traders, today the price of one tola of gold is 39,300 and the value of silver is 6,870.
According...
Heavy damage to power sector due to Bhotekoshi flood, 12 projects of 431 MW closed
Kathmandu. About 10 percent of the country's total power generation capacity has been affected due to the floods in the Bhotekoshi River in Rasuwa. After the floods caused great damage to power generation, transmission and distribution structures,...



