November 12, 2026, Thursday
English

Irregular Tinker Naka for four years, business affected

Main News Image

Kathmandu. The Tinkar Pass of Darchula, located on the Nepal-China-Tibet border, was once the main base of trade, movement and cultural relations of the local community. For generations, local people have been doing regular business of salt, wool, food grains and other materials through this crossing.

In 2020, due to the covid-19 epidemic, Tinkar Naka has not been able to operate regularly. As the border remains closed, local business has come to a standstill, while employment opportunities have dwindled, and the citizens of the border settlements have begun to feel neglected by the state.

Yogesh Bohra, central member of Nepal-China Himalayan Friendship Society and local businessman of Byas Rural Municipality-1 Yogesh Bohra, said that there is a problem in the trade business because of the regular Tinkar crossing.

mediabaaji add

Related News

Foreign Currency Exchange Rate: What is the price of US Dollar and Euro?

Kathmandu. Nepal Rastra Bank has determined the foreign currency exchange rate for August 31. According to the new exchange rate issued by the Central Bank, today the buying rate of one US dollar is 153 rupees 24 paisa and the selling rate is 153...

The price of gold increased again, how much is the transaction?

Kathmandu. Even today, the price of gold and silver has set a record in the local market. According to the Federation of Nepal Gold and Silver Traders, today the price of one tola of gold is 39,300 and the value of silver is 6,870.

According...

What is the foreign currency exchange rate for Monday?

Kathmandu. Nepal Rastra Bank has determined the foreign currency exchange rate for Monday. According to the determined exchange rate, the buying rate of one US dollar is 144 rupees 76 paisa and the selling rate is 145 rupees 36 paisa.

Simila...

2nd Economic Enumeration, five days training for enumerators across the country from today

Kathmandu. A five-day training program for the enumerators selected for the second national economic census, 2082, to be conducted by the National Statistics Office, is starting simultaneously across the country from today. Enumerators are going t...

Heavy damage to power sector due to Bhotekoshi flood, 12 projects of 431 MW closed

Kathmandu. About 10 percent of the country's total power generation capacity has been affected due to the floods in the Bhotekoshi River in Rasuwa. After the floods caused great damage to power generation, transmission and distribution structures,...

Stock market at 2654 points, turnover exceeded 7 billion

Kathmandu. On Sunday, the first trading day of the week, the stock market closed with an improvement in normal numbers. Nepal Stock Exchange NEPSE index increased by 7.06 points to 2654 points. Along with the index, there has been an encouraging i...