September 12, 2026, Saturday
English

Galchai-Sanfrubesi road to be opened in two weeks, Kolpukhola bridge damaged by floods

Main News Image

The Kathmandu. Due to the flood, the Kolpukhola bridge connecting Dhading and Nuwakot has been damaged. Director of the Department of Roads, Dr. According to Vijay Jaisi, the bridge collapsed after excessive pressure was exerted on the bridge's bearings due to flood flow. Director General Jaisi informed that the bridge with a capacity of 600 tons was lifted and floated.

The Kolpukhola Bridge is a 40-meter long pre-stressed bridge. He informed that after the floodwaters exerted excessive force on the bearings on the upper part of the bridge, the bridge rose at a high height on one side and a low height on the other side. He says that the bridge has to sit on its bearings but is currently sitting on the stopper. He said that due to this reason the bridge could not bear the load as per the design.

According to him, preparations are being made to immediately put the bridge in the right place by placing jacks on all the four sides. He informed that for this, Galchhi-Betrawati Road Planning is looking for the necessary technical team in coordination with the contractor. The department is preparing to allow only light vehicles to operate for the time being until the bridge is repaired.

mediabaaji add

Related News

December 25: 'Christmas Day' is being celebrated today

Kathmandu. Today, followers of that religion are celebrating 'Christmas Day' to commemorate the birthday of Jesus Christ, the founder of Christianity. Two thousand and twenty-five years ago today, on December 25th, Jesus Christ was born in Bethleh...

Minister Ghising's request to speed up the Suryavinayak-Dhulikhel road construction work

Kathmandu. The overall progress of road expansion from Suryavinayak in Bhaktapur to Dhulikhel in Kavrepalanchok has reached 50 percent. Work is being done to expand the Suryavinayak-Dhulikhel section of 15.8 km road to...

Preparation for demolishing houses around the highway in Hetauda from November 20, 20 heavy equipments are ready

Kathmandu. From tomorrow, 20th of November, houses under the East-West Highway will be demolished in the Hetauda market area. Road Division Office Hetaunda is going to expand the road from Ratomate on Mahendra Highway...

Gurung community celebrating Tamu Lhosar festival today

Kathmandu. The Gurung community is celebrating the Tamu Lhosar festival today by saying goodbye to the old year and welcoming the new year. Since Lho means 'Year' and 'Saar' means change, the day of change of year is called 'Tamu Lhosar'. Tamu Lho...

Minister Kulman remembered Diwali nine years ago

Kathmandu. Minister of Energy, Water Resources and Irrigation Kulman Ghising has remembered the festival of nine years ago. On Tuesday morning, he commemorated the Diwali of the year 2073 while wishing Tihar through so...

Heavy snowfall in Mustang, life affected

Kathmandu. Heavy snow is falling in the Himalayan district of Mustang. Life has been affected due to snowfall. After the snowfall, the local administration has asked everyone not to make travel plans. Due to the snowfa...