October 13, 2026, Tuesday
English

Flow increased in Koshi, 20 doors were opened

Main News Image

Sunsari The flow of water in the Saptakoshi River has started to increase due to the rains in various districts of the Eastern Hills and Terai. Sunsari Deputy Superintendent of Police Chandra Bahadur Khadka informed that the flow of water in Koshi Barrage is 1 lakh 72 thousand 432 cusecs per second.

He informed that 20 of the 56 gates of the barrage including 52 mains and two canals have been opened in view of the possible risk due to the increase in water flow in the Koshi river. As the flow of water is increasing, a red light has been lit at the Kosi barrage as a sign of danger. According to the control room of Koshi barrage, the red flag has been hoisted as a signal of danger.

mediabaaji add

Related News

Chance of rain and snow at some places under the influence of westerly winds

Kathmandu. At present, there is a partial effect of western winds and local winds in the country. Due to its effect, most of the hilly areas of the country including Koshi, Bagmati and Gandaki regions are generally cloudy, while the rest of the hi...

Chance of heavy rain in some places of Bagmati, Gandaki and Karnali today, caution requested

Kathmandu. As the influence of Monsoon air continues across the country, there is a possibility of heavy rain in a couple of places in the hilly areas of Bagmati, Gandaki and Karnali regions today. According to the Water and Weather Forecasting Di...

Butwal-Narayangadh road still blocked

Nawalparasi The Butwal-Narayangadh road section, which has been blocked since Friday, has not been fully operational. Transport services were affected after the road became slippery and muddy in the lower section located in Binayi Triveni Rural Mu...

Chance of rain and snow with thundershowers in most parts of the country

Kathmandu. Due to the combined effect of the western low pressure line trough developed in the upper atmosphere of Nepal and the local air, there is a possibility of rain and snowfall in different parts of the country. According to the Water and W...

The main road to Makalu was blocked due to the collapse of the belay bridge over the Arun River

Kathmandu. The bailey bridge over the Arun river connecting Makalu rural municipality of Sankhuwasabha-Noom to Seduwa collapsed on Saturday morning. DSP Kumar Prasad Mainali of District Police Office Sankhuwasabha informed that while the heavy veh...

Supreme Court's order- Do not enroll students before the academic session begins

Kathmandu. The Supreme Court has issued an order in the name of the government and stakeholders not to enroll students before the academic session begins. The Supreme Court has issued an interim order on a writ petition filed by raising questions...