Flow increased in Koshi, 20 doors were opened
Sunsari The flow of water in the Saptakoshi River has started to increase due to the rains in various districts of the Eastern Hills and Terai. Sunsari Deputy Superintendent of Police Chandra Bahadur Khadka informed that the flow of water in Koshi Barrage is 1 lakh 72 thousand 432 cusecs per second.
He informed that 20 of the 56 gates of the barrage including 52 mains and two canals have been opened in view of the possible risk due to the increase in water flow in the Koshi river. As the flow of water is increasing, a red light has been lit at the Kosi barrage as a sign of danger. According to the control room of Koshi barrage, the red flag has been hoisted as a signal of danger.
Express
Related News
Reduction in forest fires, reduced by pre-monsoon rains
Kathmandu. Chait month of every year is at high risk of forest fire. But last March, the incidence of wildfires decreased only a little. Due to more than average rainfall before the monsoon, there has been a decline in fire incidents in March comp...
It got colder all over the country, the minimum temperature in Kathmandu was 3 degrees
Kathmandu. According to the Weather Forecast Division, there is a partial effect of western wind across the country. Even today, many places in Terai and hilly areas are covered with fog and fog. In the afternoon, fog and fog will remain in many p...
Tonight there will be heavy rain in these parts of the country
Kathmandu. Tonight will be mostly cloudy across the country. According to the Department of Water and Meteorology, there is a possibility of moderate to moderate rainfall in some places in the Himalayan and hilly areas of the country.
There...
Chance of heavy rain in 6 provinces, high risk of floods and landslides
Kathmandu. At present, the influence of Monsoon air is continuing across the country. According to the Water and Meteorology Division, the Monsoon low pressure line is located around Sardar place. At present, it is generally cloudy in all pa...
Change and rain in the hills, heat wave in Madhes and Lumbini for the next three days
Kathmandu. Due to the partial effect of the western low pressure line trough and local air in the upper atmosphere of the country, there is a possibility of rain and thunderstorms in different parts of the country. According to the Water and Weath...
Busy work on the west section of the Pokhara-Muglin road
Kathmandu. Work on the western section of the Pokhara-Muglin road has been accelerated with the goal of being able to build it by next June. The physical progress of the road section connecting Pokhara's Seti Bridge to Tanahun's Jamune has reached...



