Financial management of Tila 1 hydropower project led by NMB Bank
Kathmandu. NMB Bank Limited has successfully completed the financial management as the lead bank for the Tila 1 Hydropower Project located in Calikot district with a capacity of 440 MW according to the production permit. Promoted by SC Power Company Pvt Ltd, this project is being constructed in Tila Khola and its total estimated cost is 59.4 billion rupees. Out of the total cost, the Consortium Cofinancing Group of Banks will provide term loans worth Rs 44.55 billion.
In this financial management, NMB Bank Limited is the lead bank, while Global IME Bank Limited, Himalayan Bank Limited and Prabhu Bank Limited are the co-lead banks. Besides, other banks and financial institutions are also involved as member banks.
This agreement was signed by Mr. Dinesh Dulal, Assistant General Manager on behalf of NMB Bank Limited and Ms. Susan Karmacharya, President on behalf of SC Power Company Pvt Ltd. Based on the installed capacity, this is the largest hydropower project developed by the private sector so far. SC Power Company Pvt Ltd is headed by Ms. Susan Karmacharya and her group. According to the power purchase agreement of this 440 MW project, the designated year of commercial operation is December 31, 2030. In the first year of operation, it is estimated that this project will generate revenue equal to 11.4 billion rupees.
Express
Related News
What is the exchange rate of foreign currency on Saturday?
Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to Rashtra Bank, the buying rate of one US dollar has been fixed at 142 rupees 88 paisa and the selling rate is 143...
DDC to Purchase More Than 60,000 Litres of Milk Daily from Small Farmers: Tripartite Agreement Signed
Kathmandu: A tripartite agreement has been signed between the National Cooperative Federation for Agriculture, Sana Kisan Bikas Laghubitta Bittiya Sanstha Ltd., and the Dairy Development Corporation (DDC) to purchase and sell more than 60,000 litr...
Seventeen lakh farmers will be listed
Kathmandu. The Ministry of Agriculture and Livestock Development will soon list about 1.7 lakh farmers who are yet to be listed. At the local and regional level, 1.737 thousand farmers were yet to be listed due to some technical reasons including...
What is the exchange rate of which foreign currency for Tuesday?
Kathmandu. Nepal Rastra Bank has announced the foreign currency exchange rate for Tuesday, June 16. According to the exchange rate published by the National Bank, the buying rate of one US dollar has remained at 150 rupees 97 paisa and the selling...
Rumors of LP gas shortage are baseless: Managing Director Bhatt
Kathmandu. Chandika Prasad Bhatt, Managing Director of Nepal Oil Corporation, has said that the rumor of LP gas shortage is baseless. He posted on social media on Facebook on Wednesday not to believe the rumors that there is a shortage of LP gas i...
The Gas Industry Association will provide a thousand 250 cylinders free of charge to the flood-affected
The Kathmandu. The Nepal LP Gas Industry Association has provided 1,250 gas cylinders to the people affected by the devastating flood in the Bhotekoshi River in Rasuwa. The association has announced to provide gas as a humanitarian aid to the...



