August 30, 2026, Sunday
English

Financial management of Tila 1 hydropower project led by NMB Bank

Main News Image

Kathmandu. NMB Bank Limited has successfully completed the financial management as the lead bank for the Tila 1 Hydropower Project located in Calikot district with a capacity of 440 MW according to the production permit. Promoted by SC Power Company Pvt Ltd, this project is being constructed in Tila Khola and its total estimated cost is 59.4 billion rupees. Out of the total cost, the Consortium Cofinancing Group of Banks will provide term loans worth Rs 44.55 billion.

In this financial management, NMB Bank Limited is the lead bank, while Global IME Bank Limited, Himalayan Bank Limited and Prabhu Bank Limited are the co-lead banks. Besides, other banks and financial institutions are also involved as member banks.

This agreement was signed by Mr. Dinesh Dulal, Assistant General Manager on behalf of NMB Bank Limited and Ms. Susan Karmacharya, President on behalf of SC Power Company Pvt Ltd. Based on the installed capacity, this is the largest hydropower project developed by the private sector so far. SC Power Company Pvt Ltd is headed by Ms. Susan Karmacharya and her group. According to the power purchase agreement of this 440 MW project, the designated year of commercial operation is December 31, 2030. In the first year of operation, it is estimated that this project will generate revenue equal to 11.4 billion rupees.


mediabaaji add

Related News

Double-digit growth in NEPSE, turnover limited to 3 billion 29 million

Kathmandu. On the second trading day of the week, the NEPSE index increased by 16.37 points to 2619.99. During the day, 78 lakh 4 thousand 45 shares of 325 companies were bought and sold, and 3 billion 294 million shar...

Kalanga Hydro's IPO collects 2 billion rupees, how many applied?

Kathmandu. 2 billion 25 lakh 29 thousand rupees have been collected in the IPO of Kalanga Hydro Limited. According to CDS, 17 lakh 79 thousand 593 people have applied for 2 crore 25 thousand 290 shares till 5 pm today on 10th May. The company has...

Muglin -Malekhu road upgradation work started

Kathmandu. The work of upgrading the Muglin-Malekhu road, which was only a normal work due to the rainy season, has started gaining intensity. After June, the road upgrading work slowed down. After the rain stopped and the festival was over, the w...

Preparation to amend the Nepal Rastra Bank Act

Kathmandu. Nepal Rastra Bank Act 2058 is going to be amended. In order to amend and update the Nepal National Bank Act in a timely manner, the government has drafted the 'Bill to Amend the Nepal National Bank Act, 2058'. 

The Ministry o...

What is the exchange rate of which foreign currency on Tuesday?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the determined exchange rate, the buying rate of one American dollar is 145 rupees 16 paisa and the selling rate is 145 rupees 76 paisa. The...

The price of gold fell for the third day in a row, today 288 thousand per tola

Kathmandu. The price of gold in the Nepalese market has decreased for the third day in a row. According to the Federation of Nepal Gold and Silver Traders, on Tuesday, the price of gold decreased by 1,400 rupees to 288,000 rupees.

Gold was t...