EV high accident in Nawalpur Gaindakot, 8 injured
Kathmandu. 8 people were injured in an EV lift accident on Monday night in Gaindakot municipality-10 Pitauji of Nawalpur along the East-West highway. According to Nawalpur district police office, the high-speed train No. BPR 02-003 Ch 1205, which was going to Kapilvastu from Pokhara, went out of control and met with an accident.
Passengers from Kapilvastu and nearby areas including the driver were injured in the accident. An 18-month-old girl is also among the injured. Police said that all the injured are being treated at a local hospital.
Express
Related News
Legal action will be taken against those who try to acquire land by submitting false information about landlessness
Kathmandu. The land problem resolution committee under the Ministry of Land Management, Cooperatives, Federal Affairs and General Administration has said that legal action will be taken against those who provide land to landless Sukum residents an...
A dozer ran in the slums of Balkhu area
Kathmandu. The government has run a dozer in the slums of Balkhu area. Today, on Friday, the government has run a dozer in the slums of Balkhu area under the Bagmati Corridor.
The District Administration Office Kathmandu issued a notice on W...
Power outage in Dhankuta market for 36 hours
Kathmandu. The power supply of Dhankuta, which was disrupted due to the strong wind that hit on Monday night, has partially resumed operation. Although lines have been connected in some areas, the capital region is still without electricity. Accor...
Weather forecast: Chance of snowfall in these places
Kathmandu. At present there is a partial effect of western wind in Nepal. At present, there is cold in some places of Terai region. It is generally cloudy in the hilly and Himalayan areas of Koshi, Gandaki, Karnali and Sudurpaschim provinces and p...
Impact of Middle East tension: 16 international flights canceled from Kathmandu
Kathmandu. Nepal's international air connectivity has been affected after the US and Israel's attack on Iran and Iran's countermeasures. According to the Tribhuvan International Airport office, 16 scheduled international flights have been canceled...
Construction of 'Canopy Bridge' on Narayanghat-Butwal road
Narayanghat. In the eastern section of the Butwal road extension project, for the first time in Nepal, an 'overhead canopy bridge' has been constructed to allow monkeys and other tree-dwelling wildlife to cross the road safely.
The structure...



