November 9, 2026, Monday
English

EV high accident in Nawalpur Gaindakot, 8 injured

Main News Image

Kathmandu. 8 people were injured in an EV lift accident on Monday night in Gaindakot municipality-10 Pitauji of Nawalpur along the East-West highway. According to Nawalpur district police office, the high-speed train No. BPR 02-003 Ch 1205, which was going to Kapilvastu from Pokhara, went out of control and met with an accident.

Passengers from Kapilvastu and nearby areas including the driver were injured in the accident. An 18-month-old girl is also among the injured. Police said that all the injured are being treated at a local hospital.

mediabaaji add

Related News

Weather forecast: Chance of rain with thunder in all seven states

Kathmandu. At present, there is partial influence of westerly winds, high pressure system in the upper atmosphere and low pressure area in the lower atmosphere near the eastern part of Nepal.  At present, it is generally cloudy in the hilly a...

Monsoon and partial influence of westerly winds across the country, chances of rain in these 6 states today

Kathmandu. Currently, the Monsoon low pressure line is around Sardar place, according to the Weather Forecast Division. Monsoon winds and westerly winds have partial influence over the country. As a result of which there are partial clouds in the...

Now freight vehicles can ply on BP highway only at night

Kavrepalanchok. After the road was blocked due to landslides and floods in Prithvi Highway, the pressure of vehicles on BP Highway, which is being used as an alternative route, has increased tremendously. In order to manage the increasing pressure...

The partial effect of western wind across the country, how was the weather today?

Kathmandu. According to the Weather Forecast Division, there is a partial effect of western wind across the country. At present, the weather is mainly clear in the far western province, while the rest of the province is partly cloudy. Many places...

Busy work on the west section of the Pokhara-Muglin road

Kathmandu. Work on the western section of the Pokhara-Muglin road has been accelerated with the goal of being able to build it by next June. The physical progress of the road section connecting Pokhara's Seti Bridge to Tanahun's Jamune has reached...

To control the water level of Kulekhani Reservoir, there is no need to open the dam gates

Kathmandu. According to the Nepal Electricity Authority, Kulekhani Project, the water level in the Kulekhani Reservoir is currently under control and there is no risk of opening the dam immediately. According to the special bulletin of the Meteoro...