Electricity generation started from Setikhola project
Kaski. Setikhola hydropower project of 22 megawatt capacity, completed in Pokhara Metropolitan City-33 of Kaski, has started generating electricity. The project promoted by Seti Khola Hydropower Limited started in December 2078.
After the inspection and testing of the project by the technical team of the Nepal Electricity Authority, the produced electricity has started to flow in the national transmission system as a test, according to Deepak Baral, the director of the promoter company.
According to him, initially 15 days will be in the project trial period. After that, regular commercial production will begin. During that period, the electricity produced will be transferred to the Nepal Electricity Authority's system, while technical testing of the project and equipment will be conducted.
Express
Related News
Demat accounts in Nepal crossed 77 lakhs, 26 percent were linked to stock market
Kathmandu. According to the Nepal Capital Market Development Roadmap, 2083 recently published by the Nepal Securities Board, the number of demat 9 beneficiary accounts in Nepal has reached 77 lakh 66 thousand five hundred and 65. Around 1.7 lakh d...
Today, NEPSE increased by a normal number, the turnover fell to 3 billion 22 million
Kathmandu. On the fourth trading day of the week, NEPSE index increased by 1.37 points to 2585.87. During the day, 72 lakh 24 thousand 917 shares of 334 companies were bought and sold, and 3 billion 224 million shares were traded. Today, while the...
All preparations for financial calculations are complete
Kathmandu. The preparations for the second economic calculation have reached the final stage. The National Statistics Office said that enumerators and necessary inspectors have been circulated throughout the country and have reached the relevant a...
What is the exchange rate of which foreign currency on Sunday?
Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for Sunday. According to the fixed exchange rate, the buying rate of one US dollar is 148 rupees 39 paisa and the selling rate is 148 rupees 99 paisa. Similarly, the...
Narayanghat-Butwal road: All the bridges in the eastern section have been completed
Nawalparasi All the bridges on the eastern section of the Narayanghat-Butwal road section, which the government has taken forward as a national pride, have been completed. Narayanghat-Butwal Road Plan Eastern Section has informed that 33 out of 34...
Naima Expo ends, enthusiastic participation of 180,000 visitors
Kathmandu. Nepal Mobility Expo 2026 has concluded in Naima. The Naima Expo, which was officially inaugurated on July 26, was concluded today with the enthusiastic attendance of more than 180,000 visitors.
More than 30,000 people observed the...



