September 2, 2026, Wednesday
English

Electricity generation started from Setikhola project

Main News Image

Kaski. Setikhola hydropower project of 22 megawatt capacity, completed in Pokhara Metropolitan City-33 of Kaski, has started generating electricity. The project promoted by Seti Khola Hydropower Limited started in December 2078.

After the inspection and testing of the project by the technical team of the Nepal Electricity Authority, the produced electricity has started to flow in the national transmission system as a test, according to Deepak Baral, the director of the promoter company.

According to him, initially 15 days will be in the project trial period. After that, regular commercial production will begin. During that period, the electricity produced will be transferred to the Nepal Electricity Authority's system, while technical testing of the project and equipment will be conducted.

mediabaaji add

Related News

The NEPSE index fell by a few points

Kathmandu. The NEPSE index, which measures stock trading in the stock market, has fallen by a few points today. According to the Nepal Stock Exchange, the NEPSE index fell by two points and reached 2,649.51.

The snsitive index, which measure...

The economy size has 61 trillion seven billion, growth 4.61 percent

In the last Fiscal Year 2081/82, Nepal's economic growth rate is equal to four decimals and the size of the economy 61.20 billion.

 

What is the exchange rate of which foreign currency on Friday?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for Friday. According to the fixed exchange rate for today, the buying rate of one US dollar is 143 rupees 36 paisa and the selling rate is 143 rupees 96 paisa. Simi...

Search and rescue operations at Trishuli-3B hydroelectric power station

The Kathmandu. A technical team, including the Nepali Army, has been deployed in search and rescue at the Trishuli-3 'B' hydropower project site affected by the Bhotekoshi flood in Rasuwa. The Ministry of Energy, Water Resources and Irrigation sai...

What is the exchange rate of which foreign currency on Tuesday?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the fixed exchange rate, the buying rate of one US dollar is 148 rupees 71 paisa and the selling rate is 149 rupees 31 paisa. The buying rate...

Super Madi Hydropower will issue 15 percent bonus shares, AGM on October 1

Kathmandu. Super Madi Hydropower Limited has announced to distribute 15 percent bonus shares to the shareholders from the profit of the last financial year. The meeting of the board of directors held on August 8 of the company has decided to distr...