July 9, 2026, Thursday
English

Electricity generation started from Setikhola project

Main News Image

Kaski. Setikhola hydropower project of 22 megawatt capacity, completed in Pokhara Metropolitan City-33 of Kaski, has started generating electricity. The project promoted by Seti Khola Hydropower Limited started in December 2078.

After the inspection and testing of the project by the technical team of the Nepal Electricity Authority, the produced electricity has started to flow in the national transmission system as a test, according to Deepak Baral, the director of the promoter company.

According to him, initially 15 days will be in the project trial period. After that, regular commercial production will begin. During that period, the electricity produced will be transferred to the Nepal Electricity Authority's system, while technical testing of the project and equipment will be conducted.

mediabaaji add

Related News

Shangrila Development Bank declares 10 percent dividend

Kathmandu. The meeting of the board of directors of Sangrila Development Bank Limited held on the afternoon of 28th October has announced the dividend to the shareholders.
The meeting has announced that 5% bonus s...

Here is the foreign currency exchange rate for today

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the National Bank, the buying rate of one US dollar is 141 rupees 49 paisa and the selling rate is 142 rupees 09...

What is the exchange rate of which foreign currency on Saturday?

Kathmandu. Nepal Rastra Bank has determined the foreign currency exchange rate for Saturday. According to the determined exchange rate, the buying rate of one US dollar is 146 rupees 88 paisa and the selling rate is 147 rupees 48 paisa. Similarly,...

3 billion 55 crores damage to agriculture and livestock sector across the country due to rain

Kathmandu. The Ministry of Agriculture and Livestock Development has said that due to the heavy rains that occurred last October, there was a loss of 3.55 billion in the fields of agriculture and animal husbandry acros...

Today's trading closed with a six percent rise in the NEPSE index

Kathmandu. Today's trading has been closed with the third consecutive positive circuit in the Nepal Stock Exchange NEPSE index. Today, the NEPSE index increased by 162.93 points to 2,875.43 points. This is an increase of six percent. On the first...

Vijay Laguvitta's FPO will be distributed on Friday

Kathmandu. Preparations have been made to distribute this week to the FPO of Vijay Microfinance Financial Institution. Sales manager NMB Capital is preparing to distribute the FPO on Friday. By the last day, 22 lakh 99 thousand 252 people had appl...