October 23, 2026, Friday
English

Damage of one billion on Beni-Jomsom-Korla road due to monsoon disaster, reconstruction will cost up to 4 billion

Main News Image

Myagdi. Due to the latest monsoon disaster, the Beni-Jomsom-Korla road of strategic importance connecting China and India has been damaged to the physical structure worth about 1 billion rupees. It is initially estimated that a budget of 3 to 4 billion rupees will be required to restore this road, which was damaged due to the landslides and the flooding and erosion of the Kaligandaki river after the incessant rains of the second week of last October.

According to the Beni-Jomsom-Korla road plan, the flood of Kaligandaki has washed away roads in 10 places and landslides have damaged more than 50 places. According to the project head, Tejashwi Sharma, even if the damaged road costing around 80 to 90 million rupees is temporarily repaired and put into operation within 2 weeks, a large budget is required for sustainable reconstruction. "In addition to landslide and river control, the Myagdi section now has to work according to the design of the asphalt pitch," said Sharma.

mediabaaji add

Related News

What is the foreign currency exchange rate on Sunday?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the Rashtra Bank, the buying rate of one US dollar has been fixed at 141 rupees 70 paisa and the selling rate ha...

Formation of a 7-member high-level committee by the government to conduct a scientific study of the Bhotekoshi disaster

Kathmandu. The government has formed a seven-member expert study committee to find the real scientific basis and evidence of the disastrous flood in Bhotekoshi river in Rasuwa. The Ministry of Energy, Water Resources and Irrigation formed the high...

Adding 'Overhead Canopy Bridge' on Narayangadh-Butwal road section

Nawalpur. Two more 'overhead canopy bridges' are going to be constructed in the forests of the Narayangadh-Butwal road section under the East-West Highway. According to the Asian highway standards, preparations are underway to construct two overhe...

Stock market fell sharply, turnover fell to 9 billion

Kathmandu. The stock market fell on Thursday. Today, the NEPSE index decreased by 33.83 points to close at 2,833.03 points, which is a decrease of 1.18 percent. Today, a total of 207 million 43 thousand 884 shares were bought and sold, and the tra...

What is the exchange rate of which foreign currency on Friday?

Kathmandu.  Nepal Rastra Bank has determined the exchange rate of foreign currency for today. The fixed exchange rate is fixed at the buying rate of one US dollar at 147 rupees 96 paisa and the selling rate at 148 rupees 56 paise. Similarly,...

The Australian dollar, euro and pound fell, while the Bahraini dinar rose

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currencies for Monday. Even today, the US dollar remains at a high value. Some currencies, including the Bahraini dinar, have appreciated. According to Nepal Rastra Bank, the...