Busy work on the west section of the Pokhara-Muglin road
Kathmandu. Work on the western section of the Pokhara-Muglin road has been accelerated with the goal of being able to build it by next June. The physical progress of the road section connecting Pokhara's Seti Bridge to Tanahun's Jamune has reached 77.47 percent and the financial progress has reached 62.20 percent. Krishna Bahadur Kunwar, the chief engineer of the said section, said that the work will be completed on schedule except for sporadic work.
In this section of total distance of 38.71 km, 37.28 km of the second phase has been paved so far. Engineer Kunwar informed that 17.66 km of the total 36.32 km service lane has been paved so far. He said that 105 culverts have been constructed and the construction of drains is also in the final stage. Out of 13 bridges in this section, 12 bridges have been constructed.
Express
Related News
Severe fire in Garigaon, Kathmandu
Kathmandu. A massive fire broke out in a wood godown in Sinamangal, Kathmandu. A fire broke out in a wood godown near the Armed Police Disaster Squad on Tuesday afternoon. Spokesman and Superintendent of Police Pawan Kumar Bhattarai said that the...
Chance of rain and snow with thunder in hilly areas, extreme heat in plains
Kathmandu. At present, there is a partial influence of the western low pressure line in the upper atmosphere along with local and easterly winds in Nepal. Due to this weather system, it is generally cloudy in the Terai region of Koshi province alo...
How was the weather across the country on Wednesday?
Kathmandu. There is an influence of western wind all over the country. According to the weather forecasting division, the weather will remain mostly clear in the rest of the country, with partial change in the high hilly and mountainous regions of...
Chance of very heavy rain in these four provinces today, request to be cautious
Kathmandu. According to the weather forecast division, the influence of monsoon air is currently affecting the country. At present, the Monsoon low pressure line is slightly above Sardar place in the west around the Terai region of Nepal and aroun...
900 disaster incidents in Chait, 30 people died
Kathmandu. Last March, 30 people died in different parts of the country due to disasters. 16 men, 10 women and four children died in natural calamities such as fire, storm, lightning and snow.
222 people were injured in the disaster. 191 hou...
Weather forecast: Light rain and snow in high hills and mountains
Kathmandu. At present, due to the partial influence of western winds in the country, the water and weather forecasting department said that there has been a partial to normal change in different parts of the country. At present, some parts of the...



