Blocked BP highway operations
Kathmandu. The BP highway, which was blocked since yesterday evening due to incessant rain, has resumed operation. According to the District Police Office, Kavrepalanchok, the highway was brought into operation after the repair work was completed.
Transport services were affected last night due to road blockage due to incessant rain. Traffic has been made easier after the road repair, police said.
Express
Related News
Impact of Monsoon over the country: Heavy rains are likely at some places in Koshi, Bagmati and Karnali
Kathmandu. At present, there is an active influence of Monsoon air across the country. According to the Department of Hydrometeorology, Weather Forecasting Division, Monsoon low pressure line is currently located around Sardar place.
Due to...
30 new species of birds were found in Gulmi, reaching 355
Gulmi. With the discovery of 30 new species of birds, the total number of bird species found in the district has reached 355. In the recent bird census conducted by the Nepal Bird Conservation Association in the district, 30 new species of birds h...
EV high accident in Nawalpur Gaindakot, 8 injured
Kathmandu. 8 people were injured in an EV lift accident on Monday night in Gaindakot municipality-10 Pitauji of Nawalpur along the East-West highway. According to Nawalpur district police office, the high-speed train No. BPR 02-003 Ch 1205, which...
From May 18, dozers will operate in Sukumwasi slums across Kathmandu
Kathmandu. The District Administration Office Kathmandu has issued a notice to immediately vacate the unauthorized, dangerous settlements along the river. The administration issued a warning to vacate such settlements from various places in Kathma...
Starting from Baisakh 1 night bus service in Kathmandu, operating from 8 to 11 pm
Kathmandu. Shared Transport is going to operate night bus service in Kathmandu Valley from the 1st of Baisakh. This service, which will be operated from 8 pm to 11 pm, will initially be operated through 7 buses.
During the route test before...
Due to floods, landslides and erosion, major highways across the country are affected, many roads are still blocked
Kathmandu. Various major highways and road sections of the country have been affected due to floods, landslides and river erosion that have come with continuous rain. According to the latest information released by the Nepal Police, some roads are...



