September 28, 2026, Monday
English

As the flood increased, all employees of Kaligandaki Hydropower were moved to a safe place

Main News Image

Kathmandu. With the incessant rain, all the employees in the powerhouse of the Kaligandaki hydroelectric project in Syangja have been shifted to a safe place.

The 144 MW project has been closed since Friday, October 9 due to high water flow in Kaligandaki river. 

Sangeeta Giri, Assistant Manager of the project, informed that the powerhouse staff were also sent to a safe place on Sunday, October 11, as the flow of the river was high.

mediabaaji add

Related News

In the valley, heavy rains, atmospheric pollution increased!

Kathmandu. A change in weather has been seen in Kathmandu Valley. Now the weather has changed and it is raining sporadically. Besides, the pollution in the atmosphere of the valley has also increased.

Chance of light rain and snow at some places

Kathmandu. At present there is influence of western wind and local wind in Nepal. According to the Department of Hydrometeorology, Weather Forecast Division, light to moderate rain with thunder and lightning is currently occurring at few places in...

Preparations to cancel 107 schools by Kathmandu Metropolis, 15 days ultimatum to get in touch

Kathmandu. Kathmandu Metropolitan City has prepared to cancel one hundred and seven schools that are not physically functioning. On Tuesday, the metropolis issued an ultimatum to such schools to contact the education department within 15 days. Acc...

This is today's weather: Which provinces are likely to rain?

Kathmandu. According to the Weather Forecasting Division, the entire region of Koshi, Madhesh and Bagmati Provinces, some parts of Gandaki and some parts of Eastern Terai of Lumbini Province are under the influence of Monsoon. In other areas, ther...

Nepali injured in Qatar explosion

Kathmandu. A Nepali citizen was also injured in the massive explosion at the gas processing plant in the Ras Lafan industrial city of Qatar.  It has been confirmed that 13 people died in the incident. According to the Times of India, 12 India...

SEE supplementary exam results announced, 64.68 percent students passed

Kathmandu. The National Examination Board has announced the results of secondary education examination SEE 2082 supplementary grade increase examination. According to the board, out of 146 thousand 507 candidates who applied for the supplementary...