October 3, 2026, Saturday
English

An arch bridge is being built at a cost of 1 billion 21 crores

Main News Image

Damauli. The work of a four-lane bridge under construction at Damauli Bazar under the Muglin-Pokhara road section is going on in full swing. Muglin Pokhara Road Plan Eastern Section has reported that 77 percent progress has been made on the bridge being constructed over Madi River in Beas Municipality-4 and 5.

Bishnu Prasad Pandey, Engineer and Information Officer of the said section informed that the construction of the bridge is going on at a fast pace. At present, the foundation work on both sides has been completed and the arch design is being constructed, Ul said. The work of the bridge was started to be completed within three years, but after the contract expired on August 21, the deadline was extended until June 19.

mediabaaji add

Related News

What is the exchange rate of which foreign currency on Saturday?

Kathmandu. Nepal Rastra Bank has determined the foreign currency exchange rate for Saturday. According to the determined exchange rate, the buying rate of one US dollar is 146 rupees 88 paisa and the selling rate is 147 rupees 48 paisa. Similarly,...

Do not take immediate budget for the operation of Hetauda textile industry: Minister Gauri Kumari

Look around. Industry, Commerce and Supply Minister Gauri Kumari Yadav has said that the Hetauda textile industry, which has been closed for a long time, will be operated immediately without additional budget from the Ministry of Finance. Minister...

The search for those trapped in the Chilime Tunnel in Rasuwa continues: Rescue teams worked throughout the night to remove debris and debris.

Rasuwa The search and rescue of workers and technicians trapped in the Chilime tunnel area in Rasuwa has continued throughout the night. The rescue team continued to remove mud, mud and large debris accumulated near the tunnel throughout the night...

The price of gold and silver increased, how much did it reach per tola?

Kathmandu. The price of gold and silver has increased in the Nepali market on Monday. According to the Federation of Nepal Gold and Silver Traders, today the price of gold has increased by Rs 4,600 per tola. Along with this, on Monday, the price o...

Muglin -Malekhu road upgradation work started

Kathmandu. The work of upgrading the Muglin-Malekhu road, which was only a normal work due to the rainy season, has started gaining intensity. After June, the road upgrading work slowed down. After the rain stopped and the festival was over, the w...

Saha, who was rescued alive from Trishuli-3 'A', says that there must be 40-50 people inside the tunnel

Kathmandu. Sanjay Sah, who was trapped inside the tunnel of the Trishuli-3 'A' hydropower project due to the devastating flood that occurred on August 10 at Bhotekoshi in Rasuwa, has said that there may still be people inside the tunnel. Sah and m...