June 28, 2026, Sunday
English

8 billion spent on the north-south road, black paper target up to Korla

Main News Image

Kathmandu. As part of the north-south trade route expansion project, Rs. The project has spent 82 percent of the budget while the proposed cost estimate of the project is Rs 10.57 billion till FY 2081-82.

Under the Korla road of national pride connecting India and China, a 202 km road track has been opened from Maludhunga in the mountain to Nepal-China Korlana. According to the decision of the Council of Ministers on November 12, 2073, Kaligand Corridor 9Beni-Jomsam-Korla road was established as a separate project. Under which the project has been continuously upgrading the roads in Parbat, Myagdi and Mustang sections since 2073 and 74. The last revised completion period of the project has been proposed for the year 2082 and 2083. But since the road up to Korlanaka needs to be paved, it is certain that the completed period will be revised again.

Under this Kaligandaki Corridor road project, the target is to open 202 km of road tracks, 97 km of road gravel, 150 km of tarmac and 19 bridges. According to the target, by the year 2081 and 2082, the project has opened 202 kilometers of road tracks, 94 kilometers of road gravel, 88 kilometers of black paper and construction of 14 bridges have been completed, project chief Tejashwi Sharma has informed.

For Korla road, through the project, 3 km of gravel and 10 km of Kagbeni-Chusang will have to be blacked on 27 km of the road and a new contract will have to be issued for the rest. Under this project, if the 9 Kagbeni-Korla road section is also covered with black, the total cost estimate of the project may be more than 15 billion, according to the head of the project Sharma. According to the head of the project, the goal is to upgrade the road and blacken the entire 202 km double lane of the Korla road section and build the necessary bridge.

mediabaaji add

Related News

What is the currency exchange rate of which country today?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the National Bank, the buying rate of one US dollar has been fixed at 147 rupees 84 paisa and the selling rate is 148 rupees 44 paisa. Simila...

Today, NEPSE increased by a normal number, the turnover fell to 8 billion 22 million

Kathmandu. On the second trading day of the week, the NEPSE index increased by 1.53 points to 2695.73. During the day, 1.75 lakh 7776 shares of 330 companies were bought and sold, resulting in a turnover of 8.22 billion 39 lakh shares. Today, whil...

Today is the exchange rate of foreign currency, how much of which country?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the National Bank, the value of the US dollar has increased. The buying rate of one American dollar is fixed at 140 rupees 47 paisa and the s...

What is the foreign currency exchange rate on Sunday?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the Rashtra Bank, the buying rate of one US dollar has been fixed at 141 rupees 70 paisa and the selling rate ha...

Economic growth is expected to be limited to 3.855 in the current year

Kathmandu. In the current fiscal year 2082/83, the economic growth rate of Nepal is projected to be 3.85 percent. According to the national accounting data released by the National Statistics Office on Tuesday, the size of the economy is expected...

NEPSE rose by 28.73 points, turnover 6.47 billion

Kathmandu - On the second trading day of the week, NEPSE index increased by 28.73 points to reach 2639.37 points. 6.47 billion rupees were traded when 12.4 million shares of 335 companies were bought and sold. While the share price of 214 companie...