Two bodies were recovered from the tunnel of the Langtang River Hydropower Project, 25 people are still missing
Rasuwa The bodies of two people have been removed from inside the tunnel of the 20 MW Langtang Khola hydropower project located in Rasuwa. Vijaymani Bhattarai, general manager of the project, informed that the Nepali army team engaged in search and rescue in the tunnel took out those bodies on Thursday.
Earlier, the government rescue team tried to enter the tunnel from the main road, but could not advance more than 100 meters because of the stones, mud and mud. After that, the team with the technicians of the project was engaged in alternative rescue work.
On Wednesday, a team including a hydro (mechanical engineer) managed to enter the empty penstock pipe of the project and reach up to about 150 meters. Using the same penstock pipe, the army took out the bodies of two people on Thursday.
Express
Related News
All the vehicles parked at the gate of the media house were abandoned by the police
Kathmandu. All the vehicles parked at the gates of various media offices have been handed over by the police to the concerned persons. On Monday morning, Kantipur Publication, Online Khabar, Himalayan Television, Congress President Gagan Thapa's h...
World Mother Earth Day: A call for collective efforts for a sustainable future
Kathmandu. Calling for collective efforts for a sustainable future, today the World Mother Earth Day is being celebrated with various programs in different countries of the world. On the call of the United Nations, this day has been celebrated eve...
The Commission took the statement of former Inspector General Khapung
Kathmandu. The commission of inquiry formed to investigate the incidents that took place on August 23 and 24 has taken the statement of the then Inspector General of Police Chandrakuber Khapung. The Commission took a statement from Khapung at Sing...



