Two bodies were recovered from the tunnel of the Langtang River Hydropower Project, 25 people are still missing
Rasuwa The bodies of two people have been removed from inside the tunnel of the 20 MW Langtang Khola hydropower project located in Rasuwa. Vijaymani Bhattarai, general manager of the project, informed that the Nepali army team engaged in search and rescue in the tunnel took out those bodies on Thursday.
Earlier, the government rescue team tried to enter the tunnel from the main road, but could not advance more than 100 meters because of the stones, mud and mud. After that, the team with the technicians of the project was engaged in alternative rescue work.
On Wednesday, a team including a hydro (mechanical engineer) managed to enter the empty penstock pipe of the project and reach up to about 150 meters. Using the same penstock pipe, the army took out the bodies of two people on Thursday.
Express
Related News
Irrigation facility only in 62.68 percent areas across the country
Lalitpur. Due to lack of sufficient rainfall across the country, while the farmers are facing the problem of lack of irrigation during planting, the goal of irrigation expansion in Nepal has not yet been fulfilled. As a large part of arable land i...
Today is the main day of Chhath festival: Arghya is being offered to the setting sun
Kathmandu. On the main day of Kartik Shukla Shasthi i.e. Chhath festival, the setting sun is being worshiped and offered ritually. There is a practice of fasting in the evening by taking a bath in the morning and offer...
Construction of 27 km road of Naubise-Malekhu section completed
Kathmandu. Under the Nagadhunga-Mugling road expansion project, the construction work of Naubise-Malekhu section has gained momentum. In this second section, which has a total length of 43 km, a total of 27 km of road construction has been complet...
Preparations for Chhath festival have started, pond ghats are being decorated
Janakpur. With the end of Tihar, preparations for Chhath festival have started in Terai Madhesh along with Janakpurdham. The ponds and ghats of Janakpurdham are being decorated for Chhath, which is celebrated with gran...
Textbook printing has stopped, there is a risk that the next academic session will be affected
Kathmandu. Due to the delay of the government, the printing of textbooks for the next academic session has been completely affected. Although the government has prepared to revise the curriculum of school education, the printing of textbooks has b...
Melamchi water stopped completely
Kathmandu. A group of committees including vendors, Melamchi flood victims and others have stopped the transfer of Melamchi water supply to Kathmandu saying that their demands have not been met. Jagarnath Das, executiv...



