Tribhuvan University to Offer Chance Examinations for Students Since 2053 BS
Kathmandu — Tribhuvan University (TU) has been rapidly conducting irregular examinations in order to improve its academic calendar. The TU Office of the Controller of Examinations has been holding the currently irregular examinations at a brisk pace so that, starting from next Shrawan, examinations can be conducted according to the regular academic calendar, said Examination Controller Laxman Paudel.
"At present, we are conducting three to four types of examinations each month in order to correct the irregular academic calendar," he said. "Chance examinations for students since 2053 BS are also being held with the aim of completing them by Asar." In the month of Baisakh alone, four types of examinations are being conducted. At the undergraduate level, the second year of BALLB, the regular second year of the bachelor's level, and the first and second year examinations of B.Tech are currently underway.
Express
Related News
Weather forecast: Chance of rain with thundershowers at some places in hilly areas
Kathmandu. At present, there is an influence of western low pressure system in Nepal. At present, it is generally cloudy in the hilly and mountainous areas of Bagmati, Gandaki, Lumbini, Karnali and Sudurpaschim provinces and partly cloudy in the r...
Weather forecast: Chance of rain in hilly and Himalayan areas today
Kathmandu. The Water and Meteorological Forecasting Division has said that due to the influence of western low pressure line, local and easterly winds, there is a possibility of rain in the hilly and mountainous areas of the country today.
A...
Chance of rain and snowfall in Himalayan and hilly areas, heat will increase in Terai
Kathmandu. Currently, there is a partial effect of the western low pressure line in the upper atmosphere of Nepal as well as the local and easterly winds.
Due to this weather system, the Himalayan and hilly areas of the country as well as th...
The main highways are blocked in different parts of the country, what is the situation?
Kathmandu. Due to continuous rains, floods and landslides across the country, various main highways have been completely and partially blocked. According to the information released by the police headquarters, transport services have been affected...
Ramchedanda is being developed as a tourist area
Sanja. Ramchedanda, located in Walling Municipality-12 of Syangja, has recently become the choice of domestic tourists. Some places of Syangja, Parbat, Gulmi, Palpa, Kaski districts can be seen from this place, which is located on the Takuro of th...
After nine days, the flood-swept Veri Corridor in Taksugad was opened, the risk of being blocked again remains
Jajarkot. The road under the Bheri Corridor, which was washed away by flood in Taksugad in the border area of Nalgad Municipality-10 and 11 of Jajarkot, has been put into operation after nine days. The Jajarkot-Dolpa road section, which was bloc...



