Transportation has resumed on some major highways that had been blocked.
Kathmandu: Transportation has resumed on some highways in various parts of the country that had been blocked due to floods and landslides brought on by recent rainfall. Central Police Spokesperson and Deputy Inspector General of Police Avinarayan Kafle said that traffic has resumed on the Kantilokpath road section at Bhalkhola in Ward No. 3 of Bagmati Rural Municipality in Lalitpur, which had been blocked by a landslide accompanying Monday evening’s rain; the Hangangdang Thukimba-Dobhan inner road section in Ward No. 5 of Meringden Rural Municipality in Taplejung; the Araniko Highway, which had been blocked by the Eku landslide at Kodari in Ward No. 2 of Bhotekoshi Rural Municipality in Sindhupalchok; and the Kantilokpath road section at Bharyangdanda in Ward No. 8 of Bhimphedi Rural Municipality in Makwanpur.
Express
Related News
The temperature increased, the initial minimum temperature of Kathmandu above 16 degrees
Kathmandu. The temperature of the valley is increasing day by day. Meanwhile, the initial minimum temperature of Kathmandu Valley has risen above 16 degrees Celsius today. According to the information given to Nepal Khabar by the Weather For...
Weather forecast Chance of rain at one or two places in Lumbini and Sudurpaschim provinces
Kathmandu. At present, there is a partial effect of western low pressure system in the country. In addition, it is generally cloudy in hilly and mountainous parts of the country, while the remaining parts are partially cloudy. According to the Dep...
Weather forecast: As heat increases in Terai, there is a possibility of rain in hills and mountains
Kathmandu. Today, the weather in most parts of the country is generally changing. According to the Weather Forecasting Division under the Department of Water and Meteorology, it will be cloudy in the Himalayan and hilly areas of the country today...
Power outage in Dhankuta market for 36 hours
Kathmandu. The power supply of Dhankuta, which was disrupted due to the strong wind that hit on Monday night, has partially resumed operation. Although lines have been connected in some areas, the capital region is still without electricity. Accor...
The number of people going out of Kathmandu to vote in the election has increased, vehicles will be running until the 20th
Kathmandu. The number of citizens returning to their home districts from the capital Kathmandu has started to increase rapidly, targeting the House of Representatives elections to be held on February 21. Voters who are engaged in various professio...
B.P. Highway Closed After Water Level Rises in Roshi Khola
Kathmandu — The B.P. Highway has been obstructed after flooding in Roshi Khola. Traffic on the road was halted this morning after the water level in the river rose. The District Police Office, Kavre, has informed that vehicular movement on the B.P...



