This is how the work of the new road is going on in Krishnabhir, preparing to open it in August
Kathmandu. The Prithvi Highway has been blocked for 14 days after the flood that came to Trishuli via Bhotekoshi eroded the lower part of the road along the river bank. On August 14, 100 meters of the road was washed away after Trishuli cut the base of the road at Krishnabhir in Dhading, which is considered to be the main lifeline connecting Kathmandu.
The work of opening a new track above the Krishnabhir river and preparing it for the smooth movement of vehicles is going on in full swing. The work of cutting the hill and connecting the 250 meter track on both sides has been completed.
Sajna Adhikari, head of planning for the Nagadhunga-Mugling road project, said that the gravel and rolling work will start from Sunday and will be completed within 3-4 days by the end of August. "Graveling is not as easy as cutting. It should be mixed by rolling. It should be done in layers. It cannot be done in one layer," she said, "that's why it may take 3-4 days. The goal is to operate the transport from the end of this month.
Express
Related News
Pilgrims who went to Gosainkund were affected when the weather turned unfavorable
Kathmandu. Due to adverse weather conditions in the high Himalayan region of Rasuwa, pilgrims going to the holy pilgrimage site of Gosaikund on the occasion of Mahashivratri festival have been affected. Due to dense fog from Laurivinayak to Kund a...
Weather forecast: As heat increases in Terai, there is a possibility of rain in hills and mountains
Kathmandu. Today, the weather in most parts of the country is generally changing. According to the Weather Forecasting Division under the Department of Water and Meteorology, it will be cloudy in the Himalayan and hilly areas of the country today...
Weather forecast: Light rain and snowfall in some places of hilly and Himalayan areas
Kathmandu. At present, there is a partial influence of western air, a high pressure system in the upper atmosphere and a low pressure area in the lower atmosphere near the eastern part of Nepal.
At present, it is generally cloudy...
2 people died in a fire in Chaudandighi in Udaipur
Kathmandu. 70-year-old Lakshmi Narayan Khadka and 30-year-old Pawan Khadka died in a fire at Chaudandigadi Municipality-7 Beltar Shanti Chowk in Udaipur. The house of Rabin Kumar Das and Sakaldev along with Lakshminarayan's house were burnt due to...
Do not be alarmed by the possibility of rain, stay alert in risky areas, says meteorologist Vibhuti Pokharel
Kathmandu. With the possibility of the remnants of the cyclone developing in the Bay of Bengal moving towards Nepal, there is a risk of rain in different parts of the country and snowfall in the high Himalayan region. According to Vibhuti Pokharel...
The effect of monsoon will continue, which provinces will receive rain today?
Kathmandu. As the influence of Monsoon air continues across the country, there is a possibility of rain in most places today. According to the Water and Weather Forecasting Division, the low pressure line of monsoon is currently around Sardar plac...



