November 10, 2026, Tuesday
English

The water flow at Koshi Barrage is 165,000 cusecs per second, 23 gates open

Main News Image

Inruro. Due to incessant rains in the eastern hilly and Terai districts, the flow of water through the Koshi Barrage in the Koshi River has increased. The water flow through the Koshi Barrage is 1,85,130 cusecs per second.

Sunsari Superintendent of Police Chandra Bahadur Khadka said that 23 out of a total of 56 gates of Koshi Barrage, 52 main and four canal gates were opened due to the high water flow.

According to the Koshi Barrage Control Room, a red light has been lit at the Koshi Barrage as a sign of danger, while a red flag has also been hoisted.

The control room said that the situation of the water level is being continuously monitored, with the expectation that the flow of water in the river will continue to increase.

mediabaaji add

Related News

Chance of rain and snow with thundershowers in most parts of the country

Kathmandu. Due to the combined effect of the western low pressure line trough developed in the upper atmosphere of Nepal and the local air, there is a possibility of rain and snowfall in different parts of the country. According to the Water and W...

Weather forecast: Chance of rain and snow in these places

Kathmandu. According to the Weather Forecast Division, there is a partial influence of western wind in Nepal at present. Because of this, it is generally cloudy in the mountainous and mountainous regions of the country today.

According to th...

Appeal to be vigilant today and tomorrow, warning not to go to risky places and stay safe

Kathmandu. Due to the low pressure system that has developed in the Bay of Bengal, the possibility of heavy rainfall has increased in various parts of the country today and tomorrow. According to the Meteorological Forecasting Division, monsoon ac...

Preparation to blacklist 9 construction companies

Kathmandu. The Public Procurement Monitoring Office under the Prime Minister's Office has initiated the process of blacklisting nine construction companies. The office has issued a notification today and has asked the construction company for a wr...

The main road to Makalu was blocked due to the collapse of the belay bridge over the Arun River

Kathmandu. The bailey bridge over the Arun river connecting Makalu rural municipality of Sankhuwasabha-Noom to Seduwa collapsed on Saturday morning. DSP Kumar Prasad Mainali of District Police Office Sankhuwasabha informed that while the heavy veh...

Objection of 11 students' organization stating that there is a serious error in the publication of Class 12th results

Kathmandu. Various 11 student organizations have strongly objected to the serious technical error seen in the publication of the results of class 12 and the shortcomings seen in the SEE results published some time ago.

11 student organizatio...