October 1, 2026, Thursday
English

The result of SEE will be announced by 29 Baisakh

Main News Image

 Kathmandu. The National Examination Board is doing the entry work to publish the results of the Secondary Education Examination SEE within 1 month. The board has prepared to announce the results within 29 Baisakh. According to the Controller of Examination Tukraj Adhikari, mark slips and answer sheets are coming from the districts. We are entering by separating the mark slip. The answer book is also coming," he said.

mediabaaji add

Related News

Impact of Monsoon over the country: Heavy rains are likely at some places in Koshi, Bagmati and Karnali

Kathmandu. At present, there is an active influence of Monsoon air across the country. According to the Department of Hydrometeorology, Weather Forecasting Division, Monsoon low pressure line is currently located around Sardar place.

Due to...

Chance of very heavy rain in these four provinces today, request to be cautious

Kathmandu. According to the weather forecast division, the influence of monsoon air is currently affecting the country. At present, the Monsoon low pressure line is slightly above Sardar place in the west around the Terai region of Nepal and aroun...

Formation of Resource and Need Mapping Team to study Rasuwa-Bhotekoshi flood affected area

Kathmandu. The Monsoon Response Command Post under the National Disaster Risk Reduction and Management Authority has formed a special team to coordinate the study and research in the Rasuwa-Bhotekoshi flood-affected areas. The 16th meeting of the...

Effect of Monsoon air across the country: Chance of heavy rain in hilly areas of 6 provinces

Kathmandu. At present, there is a direct effect of Monsoon air across the country. According to the Department of Water and Meteorology, Weather Forecasting Division, the low pressure line of monsoon is located north of Sardar place, so weather ac...

Krishnabhir Landslide: Temporary track to be opened within 15 days, appeal to use alternate route

Kathmandu. Muglin Naubise section of Prithvi Highway has been completely blocked due to a huge landslide in Krishnabhir in Dhading. After Trishuli river eroded the land under the road, the vehicles going to West Nepal including Chitwan, Tanahun, K...

Araniko Highway will be closed at night from June 22 to 15

Kavrepalanchok. In order to speed up the Dhulikhel-Khawa road section under the Araniko highway, which is being upgraded, the movement of vehicles will be stopped for 15 days from the third week of this June. The District Security Committee has in...