October 17, 2026, Saturday
English

The process of implementing a modern landing system at Pokhara International Airport has progressed

Main News Image

30 October, Kathmandu. Due to bad weather and low visibility, the process of implementing a modern air navigation system has been progressed to reduce the problems of flight disruptions, diverting to other airports and flight cancellations at Pokhara International Airport. Nepal Civil Aviation Authority has completed the preliminary technical study to implement RNP-AR, a special performance-based air guidance and landing system that requires permission at the airport.

At present, guidance and landing system based on radio signal is in operation at Pokhara International Airport. Due to the geographic location of the airport and the surrounding mountainous terrain as well as technical and operational limitations, flight operations in adverse weather conditions are challenging.

The new system will be satellite based. In order to implement this, a detailed process design, technical validation, safety assessment and regulatory approval will have to be completed.

mediabaaji add

Related News

What is the foreign currency exchange rate for dollars, euros and pounds?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the new rate announced by the Central Bank, the buying rate of one US dollar is 154 rupees 22 paisa and the selling rate is 154 rupees 82 pai...

Re-operation after five months at Satighat of Arun river

Bhojpur. The Arun river ferry service at Satighat, which connects Bhojpur and Sankhuwasabha from the north, has resumed operation after six months. The ferry, which has been closed since last May due to rain, has been brought back into operation f...

Shikhar Power's IPO allotment, 24 lakh 66 thousand applicants empty handed

Kathmandu. Shikhar Power Development Limited opened the sale to the general public from February 17th to 26th, and the IPO was distributed today on March 3rd by Global IME Capital Limited, the sales manager. The company got permission from the Nep...

In the construction of the building, bribes and employees including the engineer in the trap of the authority

Biratnagar. The Commission for Investigation of Abuse of Authority has arrested three persons in connection with bribery related to building construction in Dhankuta and Bhojpur districts. According to the authority, engineer Suman Rai, accounting...

The fuel facility of certain officials and government employees has been reduced

Kathmandu. In order to control public expenditure and manage the fuel crisis, the government has decided to significantly reduce the fuel facilities provided to government employees and special officials. According to the Ministry of Finance, due...

Reactivated after five years, Nepal-India joint agricultural system, emphasis on trade and technology

Kathmandu. The ninth meeting of the Joint Agriculture Working Group, which was formed with the aim of giving a new impetus to the strategic cooperation in the agricultural sector between Nepal and India, has been completed in Kathmandu after five...