The price of gold and silver in the Nepalese market fell sharply, gold decreased by 8,200 tolas
Kathmandu. In the Nepalese gold and silver market, the price of both gold and silver has fallen significantly on Sunday. According to the information released by the Nepal Gold and Silver Traders Federation, on the first trading day of the week, the price of gold unexpectedly dropped by 8,200 rupees per tola.
With this big decline, today the price of gold in the market is maintained at 3800 rupees per tola. Earlier, on the last trading day of the last week i.e. Friday, gold was traded at a high price of Rs. 3 lakh and 9 thousand per tola. Along with gold, the price of silver has also dropped significantly today, according to the federation.
Express
Related News
US dollar and pound rise: Here are today's foreign exchange rates
Kathmandu. Nepal Rastra Bank has determined the new exchange rate of foreign currency for Thursday. According to the Central Bank, there has been an increase in the price of the American dollar today, the buying rate of which has remained at 144 r...
Foreign Currency Exchange Rate: US Dollar crossed Rs.152
Kathmandu. Nepal Rastra Bank has announced the exchange rate of foreign currencies for Monday. According to the new rate fixed by the Central Bank, the price of US dollar has increased and the buying rate of one US dollar has reached 152 rupees 23...
NEPSE closed with an increase in normal numbers, turnover of 3 billion 49 crores
Kathmandu. On the last trading day of the week, the NEPSE index increased by 1.13 points to 2545.73. During the day, 76 lakh 5 thousand 584 shares of 329 companies were bought and sold, with a turnover of 3.49 bi...
The NEPSE index fell by a few points
Kathmandu. The NEPSE index, which measures stock trading in the stock market, has fallen by a few points today. According to the Nepal Stock Exchange, the NEPSE index fell by two points and reached 2,649.51.
The snsitive index, which measure...
How was the weather across the country on Friday?
Kathmandu. Currently, there is no significant impact of any weather system across the country, according to the Water and Weather Forecast Division.
According to the division, the weather will remain mostly clear...
Preparing to operate traffic through the reconstructed BP highway during rainy season
Kavrepalanchok. BP Highway, which has been damaged by repeated floods and landslides, is currently undergoing permanent reconstruction. Divisional Road Office Bhaktapur said that the permanent reconstruction work started at three places of the dam...



