The engine of the Turkish Airlines flight from Kathmandu caught fire
Kathmandu. One of the engines of the Turkish Airlines plane flying from Kathmandu's Tribhuvan International Airport to Istanbul, Turkey, caught fire. The plane tried to return after a problem was noticed shortly after take off.
After hovering in the sky of Kathmandu for a while, the plane took permission to land in Kolkata and went there. According to airport sources, the problem was noticed after taking off from the airport.
Express
Related News
4.2 magnitude earthquake with epicenter at Kotdeval in Bajhang
Bajhang. Kotdeval, located in Bajhang district of Sudurpaschim Province, was the epicenter of the earthquake. According to the National Earthquake Measurement and Research Center, an earthquake of 4.2 magnitude was measured at 4:40 am today.
Tribhuvan University to Offer Chance Examinations for Students Since 2053 BS
Kathmandu — Tribhuvan University (TU) has been rapidly conducting irregular examinations in order to improve its academic calendar. The TU Office of the Controller of Examinations has been holding the currently irregular examinations at a brisk pa...
Chance of rain and snowfall at many places including Koshi, Bagmati and Gandaki, wind and heat in Terai
Kathmandu. At present, there is a combined effect of westerly winds, local winds and a low pressure system near the eastern part of the country in Nepal. Due to this, light rain with thunder and lightning is occurring in a couple of places in Kosh...
17 people died in Jaljala jeep accident
Kathmandu. 17 people died in a jeep accident in Jaljala at Thawang in Rolpa. The accident occurred when the jeep, which was going from Rukum east to Jaljala 6, fell down about 800 meters from the Bhir in Jaljala 1 of Thawang Rural Municipality.
Transfer of CDOs of 6 districts
Kathmandu. The Ministry of Home Affairs has transferred and posted eight officials including the Chief District Officer CDO of 6 different districts. According to the ministerial decision on Monday 12 October, the duties of the CDOs of six distric...
BP Highway: Amid the rush of permanent reconstruction, the challenge of rains and landslides remains
make it The Khurkot (Bhakundebensi) section of the BP highway, which has been blocked in places due to landslides and the erosion of the Roshi river, is still closed today. As the work to remove the obstruction is yet to be completed, the Chief Di...



