The condition of Dinesh Sitaula, a member of Balen's team, who fainted during the election journey, is alarming
Kathmandu. According to the hospital, the health condition of Dinesh Sitaula, who is being treated for brain haemorrhage while campaigning with Balendra Shah Balen, a senior leader of Rashtriya Swatantra Party RSVP, is alarming. Since two days, Sitaula is being treated in the ICU ventilator of Grandi International Hospital in Kathmandu. The hospital said that his health is worrying.
Sitaula, who reached Achham along with Shah, a senior leader of RSVP, fell unconscious on the morning of January 16. He was brought to Grandi International Hospital in Tokha by helicopter from Achham.
Sitaula was taken to Achham district hospital after he fell unconscious. CPR was given for 45 minutes at the district hospital. After his heartbeat returned, he was given artificial respiration and taken to Surkhet by an army helicopter. From there it was brought to Kathmandu by air. He was unconscious when he was brought to the hospital. The hospital said that even though he was on the ventilator in the ICU, further treatment could not be carried out as he was not breathing. According to hospital sources, his health condition was serious when he was brought to the hospital. He was unconscious when he was brought to the hospital. The doctors involved in the treatment said that they tried to put him in the ICU but they did not succeed.
Express
Related News
After the flood, the condition of Devighat is very bad, the settlement has turned into a bagger
Nuwakot. After the flood and erosion, the situation in Devighat area of Nuwakot has become critical. The devastating floods have washed away houses in the settlements and dumped sand, mounds and debris in large areas. Some houses have been complet...
A one-way slope completed on the eastern section of the valley
Kathmandu. Under the Narayangadh-Butwal road expansion project, the one-way slope of the road in the southern part of the eastern section has been successfully completed. According to Shiv Khanal, the information officer of the eastern secti...
38 people are believed to be trapped in the Upper Trishuli 3 'A' Tunnel: The mouth of the tunnel was opened by blasting
The Kathmandu. As many as 38 technicians and workers are believed to be trapped inside the tunnel tunnel of the 60-megawatt Upper Trishuli 3A hydropower project due to the severe floods in the Bhotekosi and Trishuli rivers on Wednesday.
Con...
After the bursting of the lake, the flood came down from Syafrubesi in Rasuwa, an appeal to be on high alert
Kathmandu. After the bursting of a natural lake formed near the confluence of the Chochen River in China's Tibet and the Purepu Tsangpo River in Nepal, a severe flood has descended from Syafrubesi in Rasuwa. According to the Flood Forecasting Divi...
Monitoring of Authority's Dispatch Center at Suchhatar for Power Demand and Supply Management
Kathmandu. Energy Water Resources and Irrigation, Physical Infrastructure and Transport and Urban Development Minister Kulman Ghising has taken information about electricity demand and supply management on special days...
Two bodies were recovered from the tunnel of the Langtang River Hydropower Project, 25 people are still missing
Rasuwa The bodies of two people have been removed from inside the tunnel of the 20 MW Langtang Khola hydropower project located in Rasuwa. Vijaymani Bhattarai, general manager of the project, informed that the Nepali army team engaged in search an...



