SY Panel's IPO Allotment, Here's how to view the results
athmandu. SY Panel Limited has distributed the IPO issued to the general public from October 19th to 23rd. The company had opened the IPO sale of a total of 44 lakh 76 thousand 156 shares to the general public at a rate of Rs 100 per share. More than 21.5 million people applied for the IPO during the sale period. The company has cut down the applications received and distributed the IPO at the rate of 10/10 shares to 4 lakh 7 thousand 615 applicants who applied properly. Out of these, 6 people got 11 shares in IPO with 1 share each.
Express
Related News
NEPSE increased by 8.81 points, turnover of 3.72 billion
Kathmandu. On the last trading day of the week, the stock market increased by 8.81 points on Thursday. With this increase, the NEPSE index has reached 2,651.21 points. According to the Nepal Stock Exchange, shares worth 3.72 billion rupees were tr...
What is the foreign currency exchange rate today? see
Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the Rashtra Bank, the buying rate of one US dollar is 147 rupees 15 paise and the selling rate is 147 rupees 75 paise.
Simi...
Modi Energy has received preliminary approval for the issue of rights shares from the Electricity Regulatory Commission
Kathmandu. Modi Energy Limited has received prior approval from the Electricity Regulatory Commission to issue rights shares. The company had submitted an application to the Electricity Regulatory Commission seeking prior approval for the issue of...
Second day break in NEPSE, which has been continuously falling, turnover of 2 billion 90 crores
Kathmandu. The NEPSE index increased by 9.24 points on Tuesday, the second trading day of the week. The stock market, which has been continuously falling, has seen an improvement today.
Today, the NEPSE index increased by 9.24 points to 2,52...
Beni Hydropower's IPO is open to public
Kathmandu. Beni Hydropower Project Limited has opened its initial public offering (IPO) sale to the general public from today. The company has issued 8 lakh 63 thousand 200 shares to the general public at a price of Rs 100 per share.
The Nep...
An arch bridge is being built at a cost of 1 billion 21 crores
Damauli. The work of a four-lane bridge under construction at Damauli Bazar under the Muglin-Pokhara road section is going on in full swing. Muglin Pokhara Road Plan Eastern Section has reported that 77 percent progress has been made on the bridge...



