Shikhar Power Development Limited releasing IPO for general public from February 17th
Kathmandu. Shikhar Power Development Limited is going to open the initial public issue IPO from February 17. The company has announced that it is going to issue a total of 18 lakh 42 thousand 600 ordinary shares to the general public. Out of the total shares to be issued, 111,000 shares have been allocated for the collective investment fund and 44,400 shares for the employees of the company. Ordinary investors can apply for the rest of the shares. According to the company, investors can apply for a minimum of 10 shares to a maximum of 10,000 shares.
Asba member banks and financial institutions approved by the Nepal Securities Board and their designated branch offices can apply for the IPO. In addition, investors can also apply online through the 'My Share' system. According to the company, the IPO will be open until February 22 at the earliest and until March 1 at the latest.
Express
Related News
As the US dollar appreciates so does the exchange rate of other foreign currencies
Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the fixed exchange rate, the value of the US dollar has increased. For today, the buying rate of one US dollar is 149 rupees 11 paisa and the...
How much did Balen spend in the election?
Surunga. Walendra Sah Balen, who was elected as a member of the House of Representatives from Jhapa-5, has released his election expenditure details. According to the details submitted to the district election office through the election represent...
Apollo Hydropower's IPO to the public
Kathmandu. The IPO sales manager Himalayan Capital, which was opened to the general public by Apollo Hydropower Limited from 26th Chait to 2nd Baisakh, has been distributed today. The company had issued a total of 780 thousand 200 IPO shares to th...
Foreign currency exchange rate set for today
Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the National Bank, the buying rate of one American dollar has been fixed at 151 rupees 63 paisa and the selling rate is 152 rupees 23 paisa....
Hydropower projects in Myagdi were affected by flood and landslides, production of 20 megawatts of electricity was stopped
Myagdi. Due to floods and landslides, the work of the hydropower project under construction in Myagdi has been affected, while the power generation from two projects that are in operation has stopped. The projects of Dhawalagiri, Annapurna and Mal...
Re-operation after five months at Satighat of Arun river
Bhojpur. The Arun river ferry service at Satighat, which connects Bhojpur and Sankhuwasabha from the north, has resumed operation after six months. The ferry, which has been closed since last May due to rain, has been brought back into operation f...



