Request not to trek in high hilly and Himalayan areas from 12th to 14th of Kartik
Kathmandu. The Immigration Department has requested not to walk on Kartik 12th, 13th and 14th. The department issued a notice on Tuesday and mentioned that there is a high risk of heavy snowfall, blizzard and avalanche in the high hilly and Himalayan areas from Kartik 12th to 14th.
The department has requested the tourists not to go to the high hilly and Himalayan areas and if they have gone, stay in a safe place during this period.
Express
Related News
A doctor died after falling from the 5th floor of Nobel Hospital
Biratnagar. A doctor died after falling from the fifth floor of Nobel Medical College Hospital building in Biratnagar, Morang. District Police Office Morang has informed that the dead body of Dr. Amit Yadav, an intern resident of Saptari working i...
Direct regular commercial flight from Pokhara by Fly Dubai
Gandaki Fly Dubai has officially launched regular commercial flights from Pokhara International Airport to Dubai Pokhara Dubai from today. According to the flight schedule, Fly Dubai's Boeing 737 Max aircraft, which took off from Dubai Internation...
People's Movement Day is being celebrated today
Kathmandu. People's Movement Day is being celebrated today by organizing various programs to commemorate the restoration of democracy in Nepal. V.No. Today is the day to commemorate the restoration of democracy by ending the 30-year-old Panchayat...
These are alternative routes to the ever-congested roads
Nawalparasi The southern road section of Nawalparasi under the East-West highway is going to be operated one-way for two months. In addition to the expansion of the Narayanghat-Butwal road, as a culvert has to be const...
The minimum temperature of Kathmandu decreased from the previous day
Kathmandu. Today, the minimum temperature in Kathmandu valley has dropped below yesterday. According to the meteorologist of the weather forecast division, the minimum temperature of Kathmandu was 5.2 degrees Celsius at 5:45 am today. At this time...
The road construction of the southern section is in the final stage
Kathmandu. The construction work of the southern road section under the East-West highway has reached its final stage. The project claims that the concrete slope in this section will last for at least 30 years. According to Chudaraj Dhakal, projec...



