November 4, 2026, Wednesday
English

Prithvi Highway: Malekhu-Mugling road section will be closed for three hours today

Main News Image

Chitwan. The Malekhu-Mugling road section under Prithvi Highway will be closed for three hours today. Due to the need to put a girder on the passenger side of Akashe Bridge in Mazhimtar of the road section, the traffic on that road section will be completely closed from 11:00 am to 2:00 pm.

According to Sachendra Mishra, information officer of Nagadhunga Mugling Road Project West Section, the road is going to be closed for the purpose of placing the bridge girder. He informed that all types of vehicles traveling through the Malekhu (Mugling road section) will be banned during that period.

During the road closure, the project has requested the drivers and passengers to patiently remain in place, maintain lane discipline and follow the traffic rules. The project has also apologized for the inconvenience caused when the road is closed.

mediabaaji add

Related News

Partial influence of western low pressure system remains, light rain likely in these three states today

Kathmandu. At present, the effect of the remnants of Cyclone Arnab, a low pressure area near western Nepal, has weakened. As the western low pressure system in the upper atmosphere has only a partial effect, the weather is likely to gradually impr...

Transportation has resumed on some major highways that had been blocked.

Kathmandu: Transportation has resumed on some highways in various parts of the country that had been blocked due to floods and landslides brought on by recent rainfall. Central Police Spokesperson and Deputy Inspector General of Police Avinarayan...

Blocked BP highway operations

Kathmandu. The BP highway, which was blocked since yesterday evening due to incessant rain, has resumed operation. According to the District Police Office, Kavrepalanchok, the highway was brought into operation after the repair work was completed....

Taplejung was shaken in one morning, the earthquake of magnitude 4 was felt!

Kathmandu. The shock of the earthquake was felt in the area around Kanchenjunga in Taplejung. According to the National Earthquake Measurement and Research Center, an earthquake of magnitude 4 occurred today at 2:47 am.

According to the cent...

Power outage in Dhankuta market for 36 hours

Kathmandu. The power supply of Dhankuta, which was disrupted due to the strong wind that hit on Monday night, has partially resumed operation. Although lines have been connected in some areas, the capital region is still without electricity. Accor...

38 injured in bus accident coming from Dang to Kathmandu

Kathmandu. A bus accident occurred on the Muglin-Narayangadh road section of Chitwan while coming from Dang to Kathmandu. 38 people were injured in the accident. The condition of 10 of them is moderate and the condition of 28 is normal, police sai...