November 7, 2026, Saturday
English

Prithvi Highway: Malekhu-Mugling road section will be closed for three hours today

Main News Image

Chitwan. The Malekhu-Mugling road section under Prithvi Highway will be closed for three hours today. Due to the need to put a girder on the passenger side of Akashe Bridge in Mazhimtar of the road section, the traffic on that road section will be completely closed from 11:00 am to 2:00 pm.

According to Sachendra Mishra, information officer of Nagadhunga Mugling Road Project West Section, the road is going to be closed for the purpose of placing the bridge girder. He informed that all types of vehicles traveling through the Malekhu (Mugling road section) will be banned during that period.

During the road closure, the project has requested the drivers and passengers to patiently remain in place, maintain lane discipline and follow the traffic rules. The project has also apologized for the inconvenience caused when the road is closed.

mediabaaji add

Related News

Cloudy today, chance of moderate rain and snow showers across the country

Kathmandu. At present, there is influence of western low pressure system and local air in Nepal. At present, most of the hilly and mountainous areas including Madhesh, Bagmati, Gandaki, Lumbini, Karnali and Sudurpaschim provinces are mostly cloudy...

Muglin-Narayangadh road collapsed again due to continuous rain

Kathmandu. Due to incessant rains, the road has been blocked due to a landslide from the Namsi Khola bridge under the Muglin-Narayangadh road section. According to Road Division Bharatpur, the road was blocked due to a landslide on Sunday morning....

The identity of the scooter driver who died in a collision with a tipper in Banepa, the tipper driver was arrested

Kathmandu. The identity of the scooter driver who died after being hit by a tipper in Banepa has been identified. According to District Police Office Kavre, the deceased is 31-year-old Oman Pradhan, who is a resident of Dhulikhel Municipality 8 in...

Tribhuvan Airport will remain closed for 7 hours at night till May 4

Kathmandu. In order to speed up infrastructure construction at Tribhuvan International Airport, flights and landings will be stopped for 7 hours every night. According to Induraj Adhikari, Head of Terminal Management Division of the airport, the a...

After the flood of Roshi Khola, blocked BP highway in operation

Ramechhap. The BP highway, which was blocked due to the flood in Roshi River, has resumed operation. The highway, which was blocked after the flood washed away the diversion on Saturday, has been operational since Monday evening. According to the...

Chance of rain with thundershowers in high hills and Himalayas

Kathmandu. At present, due to the partial influence of western and local winds in Nepal, the hilly and mountainous areas are generally cloudy. According to the Department of Water and Meteorology, Weather Forecasting Division, the weather is mainl...