Preparation to ensure electricity supply from India from Kartik
Kathmandu. The Nepal Electricity Authority has said that it has completed preparations to ensure electricity supply from India from next Kartik. According to the authority, many projects are of run-of-the-river type and there is a natural decline in production as river flow dependence and discharge decrease. Due to the addition of many projects this year as well, there is a need to ensure supply from India in winter.
The Electricity Authority has given 21 days time to pay the arrears to the customers on October 12 and 13 and requested them to pay by October 2. In addition, the board of directors has also arranged that the arrears can be paid in 28 installments. Authority spokesperson Rajan Dhakal also disclosed the reasons for the delay in the construction of the transmission line. The main reasons are procedural challenges related to forest and tree cutting, local social constraints and difficult geographical conditions. Most of the projects are in the hilly areas, while the consumption centers are in the south, so the construction of the north-south transmission line is challenging, he said.
The electricity authority has clarified that the current tripping or service disruption is not load shedding, Dhakal clarified. The line was interrupted for some time due to technical reasons and there was no structural damage to the system. It has been mentioned that the authority is constantly trying to provide reliable service to the customers and is ready to improve where there are deficiencies.
Express
Related News
Today's trading closed with a six percent rise in the NEPSE index
Kathmandu. Today's trading has been closed with the third consecutive positive circuit in the Nepal Stock Exchange NEPSE index. Today, the NEPSE index increased by 162.93 points to 2,875.43 points. This is an increase of six percent. On the first...
An increase of 8.97 points in NEPSE, turnover above 11.1 billion
Kathmandu. On the fifth trading day of the week, the NEPSE index increased by 8.97 points to 2671.07. During the day, 277780584 shares of 337 companies were bought and sold, totaling 11.10 billion 25 million shares. Today, while the share price of...
Decline in paddy production in Bhojpur: Farmers suffer due to erratic weather
Bhojpur. Due to irregular weather this year, paddy production has declined in Bhojpur district. According to Krishi Gyan Kendra, the production has decreased due to the lack of sufficient rain on time and the unseasonal rain after planting has dam...
Fall in the price of gold and silver, how much is the transaction per tola today?
Kathmandu. There has been a general decline in the price of gold and silver in the Nepalese market on Monday. According to the Federation of Nepal Gold and Silver Dealers, compared to Sunday, gold decreased by Rs 400 per tola on Monday. The federa...
What is the exchange rate of which foreign currency on Tuesday?
Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to the exchange rate set for today, the value of the US dollar has increased. According to the fixed exchange rate, the buying rate of one US do...
Here are the foreign currency exchange rates for today
Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to Rashtra Bank, the buying rate of one US dollar has been fixed at 149 rupees 64 paisa and the selling rate is 150 rupees 24 paisa. Similarly,...



