November 6, 2026, Friday
English

Preparation for operation on Nagadhunga Tunnel from July

Main News Image

Kathmandu. Necessary preparations have been started to bring the vehicles into operation from the month of July through the Nagadhunga-Naubise tunnel. It is expected that with the launch of Nepal's long-awaited tunnel project, traffic on the Naubise-Nagadhunga road section will be eased.

Courtesy Nepal, Project Director of Nagadhunga Tunnel Construction Project informed that internal preparations have been started to operate Nagadhunga Tunnel within the coming July. All the work inside the tunnel has been completed.

mediabaaji add

Related News

Fall in gold prices, how much per tola on Friday?

Kathmandu. The price of gold has decreased in Nepali market today. Gold has decreased by Rs 500 tola. According to the Nepal Gold and Silver Traders Federation, gold has been fixed at 249,700 rupees per tola today.

...

Today, NEPSE increased by a normal number, the turnover fell to 3 billion 22 million

Kathmandu. On the fourth trading day of the week, NEPSE index increased by 1.37 points to 2585.87. During the day, 72 lakh 24 thousand 917 shares of 334 companies were bought and sold, and 3 billion 224 million shares were traded. Today, while the...

Damage worth 1 billion in the metropolis alone during the Genji movement

Biratnagar. During the Genji movement, Biratnagar Metropolitan City's physical structure and other goods were damaged to the tune of nearly 1 billion rupees. According to Mayor Nagesh Koirala, there has been damage to...

Meeting between the governors of Nepal and China

Kathmandu. Prada Vishwanath Poudel, Governor of Nepal Rastra Bank, who is on a visit to China, and Fan Kongsong, Governor of People's Bank of China PBOC, had a meeting today.

They met at the 20th Asia Pacific High Level Meeting on Banking Su...

The price of gold increased on Tuesday, now how much per tola?

Kathmandu. The price of gold has increased in Nepali market today. Gold tola has gone up by 1 thousand 600 rupees. According to the Nepal Gold and Silver Traders Federation, today gold is being bought and sold at 3 lakh 1 thousand 300 rupees per t...

Bellybridge being installed at Arughat

Gurkha. The Nepali Army and Gorkha Road Plan have jointly started the work of installing a bailey bridge at Arughat. Last Sunday, the Budhi Gandaki flood swept away a part of the Arughat bridge connecting Gorkha and Dhading. The construction of Be...