Preparation for operation on Nagadhunga Tunnel from July
Kathmandu. Necessary preparations have been started to bring the vehicles into operation from the month of July through the Nagadhunga-Naubise tunnel. It is expected that with the launch of Nepal's long-awaited tunnel project, traffic on the Naubise-Nagadhunga road section will be eased.
Courtesy Nepal, Project Director of Nagadhunga Tunnel Construction Project informed that internal preparations have been started to operate Nagadhunga Tunnel within the coming July. All the work inside the tunnel has been completed.
Express
Related News
The Nagdhunga-Sisnekhola Tunnel will be commercially operated from Saun
Kathmandu. The Nagdhunga-Sisnekhola Tunnel, Nepal’s first modern transport tunnel, is being prepared for full commercial operation from the second week of next Saun. Providing information on the project’s current progress and operational plan, Pro...
Export of cardamom increased by sixty percent
Bhadrapur. By the end of December of the current financial year 2082-083, the export of cardamom has increased by 60.10 percent. According to the statistics of the Mechi Customs Office, during that period, cardamom worth Rs. Ishwar Kumar Humagai,...
Exchange rate, dollar and euro value stable
Kathmandu. Nepal Rastra Bank has announced the official exchange rate of foreign currency for Saturday. According to the updated information published by the Central Bank, the buying rate of one US dollar has been fixed at 151 rupees 62 paisa and...
An increase of 4.59 points in NEPSE, the turnover is 4.9 billion
Kathmandu. On the fifth or last trading day of the week, NEPSE index increased by 4.59 points to 2640.54. During the day, 104 million 31 thousand 760 shares of 328 companies were bought and sold, resulting in a turnover of 4 billion 908 million sh...
Today is the last day to file for Everest Color's IPO
Kathmandu. Today is the last day to apply for the IPO that Everest Color Limited is issuing to the general public from June 22. In the first phase, IPOs are distributed to Nepalis who are employed abroad and in the second phase, IPOs are being iss...
35 industries paid 238.7 million dedicated and trunk line tariff arrears
Kathmandu. 25 new industries which consumed electricity from dedicated and trunk line structures during load shedding in the past have paid the first installment of premium tariff arrears. Earlier, 10 industries which...


