October 25, 2026, Sunday
English

Opening of Nagadhunga tunnel tomorrow, only emergency vehicles will be allowed to ply

Main News Image

Kathmandu. Nepal's first modern transport tunnel 'Nagadhunga-Sisnekhola Tunnel' will be formally inaugurated from Monday.

The total cost of this project, which was completed with the concessional loan of Japan International Cooperation Agency (JICA) and the joint investment of the Government of Nepal, is about 19 billion rupees.

Director General of Road Department Dr. According to Vijay Jaisi, the length of the main tunnel is 2.68 km. However, if the evacuation tunnels and cross-passages inside the tunnel are counted, the total length of the tunnel reaches about 5.5 km.

mediabaaji add

Related News

What is the exchange rate of foreign currency on Tuesday?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to Rashtra Bank, the buying rate of one US dollar has been fixed at 141 rupees 52 paisa and the selling rate is 142...

125 contracts stopped due to fuel price hike

Chitwan. 125 contract works run by Infrastructure Development Office Chitwan have come to a halt. Due to the rising cost of essential items including fuel, it has become impossible to work on these contracts. According to the head of the office, B...