November 7, 2026, Saturday
English

Nagadhunga-Sisne river tunnel from today mandatory toll!

Main News Image

Kathmandu. Toll fee will be charged from today for using Nagadhunga-Sisne river tunnel. Separate toll charges have been set for cars, buses, trucks and lorries for using the tunnel according to the size and direction of the vehicle. The government has already made a decision and issued a notice in the gazette, using the authority given by sub-section 1 of section 6 of the Road Board Act, 2058, and has announced the rate according to the decision to charge the tunnel consumption fee from the vehicles plying on the Nagadhunga tunnel section.

Accordingly, cars, vans, pick-up tractors, micro buses and other light vehicles will be charged Rs 65 when entering Kathmandu and Rs 60 when leaving. Similarly, entry fee of mini bus, mini tipper (truck) is 115 rupees and exit fee is 80 rupees and bus, truck single rear axle fee is 260 rupees upon entry and 200 rupees upon exit. In case of multi-axle truck vehicles and heavy equipment, entry fee is 600 rupees and exit fee is 250 rupees. To facilitate the payment, both 'N-Tag' based on RFID technology and cash have been arranged. Two-wheelers, three-wheelers, pedestrians and vehicles carrying highly flammable substances such as diesel, petrol or gas have been completely banned from entering the tunnel.

USIN ART JV has been entrusted with the operation and management of this tunnel, built with 21 and a half billion subsidized loans from Japan and 6 billion investment from the Government of Nepal, for five years. This project, which was laid the foundation stone by the then Prime Minister KP Sharma Oli in October 2076, was inaugurated and put into operation on 11th July last after its completion was delayed due to Covid and other issues.

mediabaaji add

Related News

430 million new notes of 1000 will be printed in China

Kathmandu. The central bank has also awarded a contract to a Chinese company to print new 1,000-rate notes. According to Rashtra Bank, China Bank Note Printing and Minting Corporation has been awarded the contract to p...

After the Rasuwagadhi crossing was blocked due to flood, the journey of passengers started from Tatopani and Hilsa

Kathmandu. Due to the severe flood that occurred on 10th Bhadra last year, after the damage to the infrastructure including the immigration office at Rasuwagadhi crossing, Tatopani and Hilsa crossings have been used as alternative routes for passe...

The construction process of Budhi Gandaki project of national pride will be started immediately: Kulman

Kathmandu. The Minister of Energy, Water Resources and Irrigation, Physical Infrastructure and Transport and Urban Development Kulman Ghising has said that the investment modality of Budhigandaki hydropower project wit...

The price of gold and silver decreased, how much is the transaction going on today?

Kathmandu. The price of both gold and silver decreased in the Nepali market on Thursday. According to the Nepal Gold and Silver Dealers Federation, today the price of gold has decreased by Rs 600 per tola. Along with this, on Thursday, the price o...

The price of gold decreased, now how much per tola?

Kathmandu. The price of gold has decreased in Nepali market today. Gold tola has fallen by 500 rupees. According to the Federation of Nepal Gold and Silver Traders, today the price of gold has remained at Rs 3 lakh six thousand 200 per tola. Today...

Indian ban on tea export lifted

Biratnagar. The export of Nepali tea, which has been suspended for almost two months, has resumed from Tuesday due to the new standard 9SOP0 implemented by the Indian Tea Board in the name of testing the quality of Nepali tea.

According to A...