Muglin-Narayangadh road collapsed again due to continuous rain
Kathmandu. Due to incessant rains, the road has been blocked due to a landslide from the Namsi Khola bridge under the Muglin-Narayangadh road section. According to Road Division Bharatpur, the road was blocked due to a landslide on Sunday morning. It is estimated that it will take about two hours to remove the landslide.
Since the landslide removal work has been started and it will take time to open the road, the vehicles and passengers traveling on that road section have been requested to take necessary precautions. Incessant rains have damaged various parts of the country.
Express
Related News
It has been raining since morning, how was the weather all day?
Kathmandu. According to the Weather Forecast Division, the influence of Monsoon air is present across the country. At present, the Monsoon low pressure line is slightly above the Sardar place in the west around the Terai region of Nepal and around...
Chance of heavy rain in some places of Bagmati, Gandaki and Karnali today, caution requested
Kathmandu. As the influence of Monsoon air continues across the country, there is a possibility of heavy rain in a couple of places in the hilly areas of Bagmati, Gandaki and Karnali regions today. According to the Water and Weather Forecasting Di...
Chance of snow and rain in these areas today
Kathmandu. At present, there is influence of Monsoon air, Western air as well as low pressure area around Uttar Pradesh of India in Nepal. Monsoon low pressure line is currently located around Sardar place, said the Department of Hydrometeorology,...
Chance of heavy rain at different places of five provinces
Kathmandu. According to the Department of Water and Meteorology, Weather Forecast Division, there is a possibility of heavy rain in some places in the Himalayan and hilly areas of Koshi, Bagmati and Gandaki provinces on Sunday night.
Accordi...
Chance of heavy rain over hilly areas of Koshi, Bagmati, Gandaki and Lumbini
Kathmandu. At present, there is a partial influence of monsoon winds as well as western winds across the country. According to the Department of Water and Meteorology, Weather Forecasting Division, the low pressure line of monsoon is located...
BP Highway: Amid the rush of permanent reconstruction, the challenge of rains and landslides remains
make it The Khurkot (Bhakundebensi) section of the BP highway, which has been blocked in places due to landslides and the erosion of the Roshi river, is still closed today. As the work to remove the obstruction is yet to be completed, the Chief Di...



