Krishnabhir Landslide: Temporary track to be opened within 15 days, appeal to use alternate route
Kathmandu. Muglin Naubise section of Prithvi Highway has been completely blocked due to a huge landslide in Krishnabhir in Dhading. After Trishuli river eroded the land under the road, the vehicles going to West Nepal including Chitwan, Tanahun, Kaski via Kathmandu and Dhading were stranded.
After the highway was blocked, the road department has requested to use Tribhuvan Rajpath and Kanti Rajpath as alternative routes for the time being.
According to Deputy Director General and Spokesperson of the Road Department, Shubraj Neupane, although the road is somewhat narrow, even large vehicles can be operated from the Tribhuvan Rajpath.
Express
Related News
Impact of Middle East tension: 16 international flights canceled from Kathmandu
Kathmandu. Nepal's international air connectivity has been affected after the US and Israel's attack on Iran and Iran's countermeasures. According to the Tribhuvan International Airport office, 16 scheduled international flights have been canceled...
Iran sent the US a new proposal to end the war forever
Kathmandu. Iran has put forward a peace proposal with the aim of "ending forever" the ongoing conflict with the US and Israel. According to Iran's official news agency IRNA, the proposal was sent through Pakistan. According to the BBC, after revie...
Weather forecast: Chance of snowfall in these places
Kathmandu. At present there is a partial effect of western wind in Nepal. At present, there is cold in some places of Terai region. It is generally cloudy in the hilly and Himalayan areas of Koshi, Gandaki, Karnali and Sudurpaschim provinces and p...
Partly cloudy in Himalayan and hilly areas, possibility of heat wave in Terai region
Kathmandu. At present there is a partial influence of western and local winds in Nepal. Due to its influence, there will be clouds in the Himalayan and hilly regions of the country and the weather will be mainly clear in the plains. According to t...
Chance of light rain in some places of four provinces
Kathmandu. At present, the influence of Monsoon air is present across the country. Currently, the Monsoon low pressure line is around Sardar place, according to the Department of Water and Meteorology, Weather Forecasting Division. At present, it...
After the Bhotekoshi flood, the Mugling-Kathmandu road section is back in operation
Kathmandu. The Mugling-Kathmandu road section, which was blocked after the Bhotekoshi flood, has resumed operation from this Saturday morning. In Dhading's Baireni Bazar area, only one-way traffic is being operated on a road section of about one k...



