November 6, 2026, Friday
English

Kathmandu's sewage treatment plant will soon be put into operation

Main News Image

Kathmandu. The waste water treatment plants that have been constructed at various locations in Kathmandu Valley will soon be put into operation. It is expected that this will reduce the amount of contaminated water entering rivers and streams and help control environmental pollution. Project Implementation Directorate PID is constructing waste water treatment plant in Dhobikhola, Guhyeshwari and Kodku areas.

On Friday, representatives of the Ministry of Infrastructure Development, PID and Asian Development Bank ADB conducted a joint monitoring and inspection of the processing centers built in Guhyeshwari and Dhobikhola. It is said that Guheshwari Wastewater Treatment Center has been constructed with the capacity to process three million 2.5 million liters of waste water per day.

mediabaaji add

Related News

Warning of the department to stop the sale and distribution of prohibited items, action will be taken against those sold through online means

Kathmandu. The Department of Commerce, Supply and Consumer Protection has issued a strong warning against unauthorized importation, storage, sale and distribution of items legally banned by the Government of Nepal.

The deartment issued a pub...

Celebrating World Day Against Child Labour

Kathmandu. Today is World Day Against Child Labour. Every year, June 12 is celebrated as the day against child labor around the world. Anti-Child Labor Day is celebrated against the use of children as laborers. 

June 12 has been celebra...

Instructions to proceed with study for expansion of Tarigaon and Rara Airports

Kathmandu. Minister of Culture, Tourism and Civil Aviation Khadakraj Paudel has instructed the Civil Aviation Authority of Nepal (CAN) to proceed with the study process regarding the development and expansion of Tarigaon in Dang and Rara Airport i...

The baby who was sent home as dead by Veri Hospital is alive, the hospital has apologized

Kathmandu. It has been revealed that the Bheri Hospital in Nepalganj, Banke sent the baby home alive as dead. According to the incident report, a pregnant woman who was admitted to the labor ward of the hospital on November 25 gave birth to a baby...

Class 12 Result Publication

Kathmandu. The National Examination Board has published the Class 12 results. The result was released within 35 days of the examination. 4 lakh 18 thousand 8 examinees participated in the examination which was conducted till 14th of Baisakh 27. In...

Two bodies were recovered from the tunnel of the Langtang River Hydropower Project, 25 people are still missing

Rasuwa The bodies of two people have been removed from inside the tunnel of the 20 MW Langtang Khola hydropower project located in Rasuwa. Vijaymani Bhattarai, general manager of the project, informed that the Nepali army team engaged in search an...