November 5, 2026, Thursday
English

Demands ranging from the formation of an all-party mechanism to the implementation of 'EV Safety Education'

Main News Image

Kathmandu. In the meeting of the House of Representatives held on Wednesday, the parliamentarians demanded that an all-party committee should be formed immediately to make the search, rescue, relief and rehabilitation after the devastatng flood in the Bhotekoshi river efficient and effective.

Participating in today's emergency meeting of the House of Representatives, the MPs drew the attention of the government to pay special attention to road safety and make the experience and maturity of drivers indispensable for post-disaster rescue as well as safe transport management in the country.

Speaking at the meeting, MP Arjunnar Singh KC said that the government should be serious in making the search and rescue operations after the Bhotekoshi flood more rapid and effective and in carrying out the relief and rehabilitation works.

He informed that his party is supporting the government as much as possible at this time of crisis and emphasized that it is essential to form an all-party committee from the parliament for transparent, effective relief and rescue in the disaster.

mediabaaji add

Related News

Kanchenjunga base camp deserted

Taplejung. The base camp area of ​​Kanchenjunga, the second highest mountain in Nepal, located in Taplejung, has now become deserted. Kanchenjunga base camp area has become deserted with the end of the current tourist season.

Kanchenjunga ba...

After the death of 5 laborers in a truck accident, Barjuma road was blocked by locals

Kathmandu. On the morning of Maghe Sankranti, 5 laborers died in a truck accident at Bhokrahanrsingh in Sunsari. After the accident, the angry locals blocked the road in Sunsari by burning tires. After the untimely death of 5 people from their own...

Seven people including the driver were injured when three vehicles collided

Rautahat Seven people including the driver were injured when three vehicles collided in Rautahat. Durgabhagavati Rural Municipality Ward No. 5 Barharwa Hulaki Road, going towards Bam Canal, HR 28 D 7222 Indian Scorpio...

Impact of Devanganj tension in Biratnagar, markets-schools closed, protests continue on the highway

Biratnagar. The impact of tension in Sunsari's Dewanganj-Kaptanganj has reached Biratnagar, the capital of Koshi province. Due to the panic, the main market area of ​​Biratnagar and most of the schools have been closed since Tuesday morning.

Humla Karnali 2nd hydropower project of 335 MW capacity will be built in Humla

Kathmandu. In Humla district, which is lagging behind in economic development, the necessary process for the construction of Humla Karnali second hydropower project with a total capacity of 335 megawatts has been advan...

Due to the lack of construction of the road leading to the border posts, it is difficult for the security personnel to monitor

Humla. It is difficult for the security personnel to monitor the border post that separates the border between Nepal and China. Even though there are border pillars between the two countries in the Humla area from the local to the federal governme...