Bellybridge being installed at Arughat
Gurkha. The Nepali Army and Gorkha Road Plan have jointly started the work of installing a bailey bridge at Arughat. Last Sunday, the Budhi Gandaki flood swept away a part of the Arughat bridge connecting Gorkha and Dhading. The construction of Belybridge has started to resume the temporary transport service at the time of Dasain. According to the Gorkha Road Planning Office, the work of bailey bridge is going on to make the bridge connecting Gorkha and Dhading operational before Dasain.
Express
Related News
NEPSE decreased by eight digits, turnover of more than 2.83 billion
Kathmandu. The NEPSE index, which measures stock turnover in the stock market, is still down today. According to the Nepal Stock Exchange, the NEPSE index fell by 8.50 points and was limited to 2,651.52.
The sensitive index, which measures t...
Extensive changes in the tax system by the government through the budget: Abolition of some taxes and fees
Kathmandu. With the aim of providing relief to citizens and businessmen through the budget of the next financial year, the Government of Nepal has canceled some of the taxes and fees imposed in the past and has significantly reduced some of them....
An arch bridge is being built at a cost of 1 billion 21 crores
Damauli. The work of a four-lane bridge under construction at Damauli Bazar under the Muglin-Pokhara road section is going on in full swing. Muglin Pokhara Road Plan Eastern Section has reported that 77 percent progress has been made on the bridge...
The price of gold continues to rise, how much per tola on Friday?
Kathmandu. The price of gold has increased in Nepali market. Gold tola has increased by 3 thousand 300 rupees. On the previous day too, the price of gold had increased by Rs 9,300. According to the Federation of Nepal Gold and Silver Traders, toda...
The price of gold continues to rise, exceeding 277,000 tolas
Kathmandu. As the wedding season begins, the price of gold is constantly increasing. There have been some fluctuations in the price of silver. According to the Federation of Nepal Gold and Silver Traders, today the price of one tola of printed gol...
'Dedicated' and 'trunk line' tariff dispute: Commission's decision not to meet the demands of industrialists
Kathmandu. The Electricity Regulatory Commission has decided not to accept the demands of industrialists regarding the dedicated and trunk line tariff dispute. On Sunday, the commission decided not to submit the demand while hearing the case of Pa...



