After the flood of Roshi Khola, blocked BP highway in operation
Ramechhap. The BP highway, which was blocked due to the flood in Roshi River, has resumed operation. The highway, which was blocked after the flood washed away the diversion on Saturday, has been operational since Monday evening. According to the District Police Office, Kavre, traffic has resumed after constructing a temporary diversion at the place of the flood. As soon as the rain started on Saturday afternoon, the administration closed the road keeping in mind the possible risk.
At the same time, the flood in Roshi Khola caused damage to the diversions built in the area of about four kilometers of Roshi Khola under Katunje (Mangaltar section).
Express
Related News
EV high accident in Nawalpur Gaindakot, 8 injured
Kathmandu. 8 people were injured in an EV lift accident on Monday night in Gaindakot municipality-10 Pitauji of Nawalpur along the East-West highway. According to Nawalpur district police office, the high-speed train No. BPR 02-003 Ch 1205, which...
Kathmandu Metropolitan City said: The ban on construction on the left and right sides of the river has been lifted
Kathmandu. The Kathmandu Metropolitan City has removed the previous ban on construction permits on the left and right sides of the river within the metropolitan area. The Metropolitan Corporation issued a notice today saying that according to the...
Earthquake centered around Rayal in Bajhang
Kathmandu. The epicenter of the earthquake was around Rayal in Bajhang district. According to the National Earthquake Measurement and Research Center Lanchaur, an earthquake of magnitude 4.1 took place today at 1:14 PM with its epicenter near Raya...
Bicycle lanes will be built in the valley
Kathmandu. Kathmandu Valley Mayors Forum is going to construct a bicycle lane in Kathmandu Valley. It has been decided to build a bicycle lane to connect all the 18 municipalities of Kathmandu Valley through a bicycle lane.
The Valley Mayor'...
Weather forecast: Chance of rain in hilly and Himalayan areas today
Kathmandu. The Water and Meteorological Forecasting Division has said that due to the influence of western low pressure line, local and easterly winds, there is a possibility of rain in the hilly and mountainous areas of the country today.
A...
Muglin-Pokhara road will be closed for 4 hours daily for 10 days, these are alternative routes
Kathmandu. Muglin-Pokhara road will be closed for 4 hours daily for 10 days from today. Under the Muglin-Pokhara highway improvement plan, the western section will be closed for four hours daily to upgrade the road, ac...



