August 25, 2026, Tuesday
English

After nine days, the flood-swept Veri Corridor in Taksugad was opened, the risk of being blocked again remains

Main News Image

Jajarkot. The road under the Bheri Corridor, which was washed away by flood in Taksugad in the border area of ​​Nalgad Municipality-10 and 11 of Jajarkot, has been put into operation after nine days. The Jajarkot-Dolpa road section, which was blocked after the flood washed away the bridge and four houses along the road, has been opened for traffic after being repaired and constructed by the Bheri Corridor Road Plan in coordination with Nalgad Municipality.

After the flood in Taksugad caused great damage to the road structure and also washed away the bridge, the transport service from Jajarkot to Dolpa was completely affected. When the road was blocked, local residents, passengers and vehicles carrying daily necessities were stopped on the road.

The road was opened after the Bheri Corridor road plan in coordination with Nalgad municipality started the repair work immediately and made it possible for vehicles to operate. With the road being operational, vehicles going from Jajarkot to Tripurakot, Chalgad and other areas of Dolpa have started plying again.

mediabaaji add

Related News

Vehicular operation stopped for two days and nights in Narayani Nadi bridge area of Narayanghat Butwal section

Nawalparasi The road will be closed for two days and nights in the Narayani river area connecting Nawalpur and Chitwan in the Narayanghat Butwal section under the East-West Highway. The road will be closed for five hou...

The identity of the scooter driver who died in a collision with a tipper in Banepa, the tipper driver was arrested

Kathmandu. The identity of the scooter driver who died after being hit by a tipper in Banepa has been identified. According to District Police Office Kavre, the deceased is 31-year-old Oman Pradhan, who is a resident of Dhulikhel Municipality 8 in...

The request of the Ministry of Education to admit students only after the commencement of the new academic session

Kathmandu. The Ministry of Education, Science and Technology has said that it has drawn serious attention to the fact that some institutional schools in the country have violated the education regulations and the Supreme Court's directives by enro...

Busy work on the west section of the Pokhara-Muglin road

Kathmandu. Work on the western section of the Pokhara-Muglin road has been accelerated with the goal of being able to build it by next June. The physical progress of the road section connecting Pokhara's Seti Bridge to Tanahun's Jamune has reached...

Monsoon effect across the country, heavy rain likely in five states

Kathmandu. At present, the influence of Monsoon air is still present in the whole country and the low pressure line of Monsoon is located in Sardar. Due to this, moderate rains are occurring in some places of Koshi and Gandaki provinces, few place...

Objection of 11 students' organization stating that there is a serious error in the publication of Class 12th results

Kathmandu. Various 11 student organizations have strongly objected to the serious technical error seen in the publication of the results of class 12 and the shortcomings seen in the SEE results published some time ago.

11 student organizatio...