September 13, 2026, Sunday
English

After nine days, the flood-swept Veri Corridor in Taksugad was opened, the risk of being blocked again remains

Main News Image

Jajarkot. The road under the Bheri Corridor, which was washed away by flood in Taksugad in the border area of ​​Nalgad Municipality-10 and 11 of Jajarkot, has been put into operation after nine days. The Jajarkot-Dolpa road section, which was blocked after the flood washed away the bridge and four houses along the road, has been opened for traffic after being repaired and constructed by the Bheri Corridor Road Plan in coordination with Nalgad Municipality.

After the flood in Taksugad caused great damage to the road structure and also washed away the bridge, the transport service from Jajarkot to Dolpa was completely affected. When the road was blocked, local residents, passengers and vehicles carrying daily necessities were stopped on the road.

The road was opened after the Bheri Corridor road plan in coordination with Nalgad municipality started the repair work immediately and made it possible for vehicles to operate. With the road being operational, vehicles going from Jajarkot to Tripurakot, Chalgad and other areas of Dolpa have started plying again.

mediabaaji add

Related News

EV high accident in Nawalpur Gaindakot, 8 injured

Kathmandu. 8 people were injured in an EV lift accident on Monday night in Gaindakot municipality-10 Pitauji of Nawalpur along the East-West highway. According to Nawalpur district police office, the high-speed train No. BPR 02-003 Ch 1205, which...

Electronic passport from the new system

Kathmandu. Citizens will now get electronic passports distributed by the government through a new system. The passport department has informed that the necessary preparations for issuing passports through the new system have reached the final stag...

Monsoon low pressure line around Sardar place, today's weather will be like this

Kathmandu. At present, the influence of monsoon air continues in Nepal and the low pressure line of monsoon is around Sardar place, according to the weather forecast division.

It will be cloudy in the mountainous and hilly areas of the count...

Establishment of Response Base for Monsoon Disaster Mitigation

Baitadi As the time of active monsoon is approaching, the Armed Police Force of Nepal has established a temporary monsoon response base in Baitadi to minimize the damage that may be caused by natural disasters.

A temporary monsoon response b...

Request to take special precautions in monsoon: 47 disaster incidents in 24 hours, 3 deaths

Kathmandu. The National Disaster Risk Reduction and Management Authority has appealed to the general public to take special precautions as the risk of disasters such as floods, landslides, inundation, lightning and snake bites has increased across...

Weather forecast: Light rain and snowfall in some places of hilly and Himalayan areas


Kathmandu. At present, there is a partial influence of western air, a high pressure system in the upper atmosphere and a low pressure area in the lower atmosphere near the eastern part of Nepal.

At present, it is generally cloudy...