July 22, 2026, Wednesday
English

A ship carrying 30,000 metric tons of urea arrived at Calcutta port

Main News Image

Kathmandu. A third ship carrying 30,000 metric tons of urea fertilizer has arrived at Calcutta port in India with the aim of providing timely chemical fertilizers to the farmers of Nepal. According to the Ministry of Agriculture and Livestock Development, there has been some disruption in the operation of freight trains to India due to continuous rain.

It has been learned that the train carrying 1,250 metric tons of urea fertilizer, which was supposed to arrive in Nepal earlier, will arrive by tomorrow. Similarly, another train carrying 2500 metric tons of DAP fertilizer is also expected to arrive in Nepal by tomorrow.

mediabaaji add

Related News

Double-digit decline in NEPSE, turnover fell to 10.77 billion

Kathmandu. On the second trading day of the week, the NEPSE index decreased by 26.05 points to 2672.39. Today, during the day, 267 million 66 thousand 347 shares of 324 companies were bought and sold, totaling 10.77 billion 39 million shares. Toda...

Preparation for regular flights from Kathmandu to Dhaka

Kathmandu. Nepal Air Service Corporation has prepared to fly directly from Kathmandu to Dhaka, the capital of Bangladesh in the near future. The Corporation has started the necessary preparations and has formed a Feasibility Study Sub-Committee fo...

An increase of 47.22 points in NEPSE, turnover of 7.3 billion

Kathmandu. On the first trading day of the week, NEPSE index increased by 47.22 points to 2647.44. During the day, 1 crore 42 lakh 4 thousand 362 shares of 330 companies were bought and sold, and more than 7.3 billion...

Purchase of paddy at support price by cooperative in Bardia, relief to farmers

Bardia. The government had fixed the minimum support price of rice at the time to provide a fair price of rice to the farmers. Although the minimum support price of paddy was fixed, the farmers were not able to get the...

8 billion spent on the north-south road, black paper target up to Korla

Kathmandu. As part of the north-south trade route expansion project, Rs. The project has spent 82 percent of the budget while the proposed cost estimate of the project is Rs 10.57 billion till FY 2081-82.

Large development projects are affected by the increase in the price of petroleum products

Mahendranagar. Due to the recent increase in the price of petroleum products and problems in supply, the work of large development projects in the Far West has been affected. It is said that although the builders are working with the fuel they hav...